[1] |
SUN Zhenchuan, LI Fengyuan, CHU Changhai.
Analysis Method of Correlation between Shield Tunneling and Geology Based on Big Data
[J]. Tunnel Construction, 2020, 40(2): 162-169.
|
[2] |
YU Yu, LI Laosan.
Review on Risk Assessment and Control Measures for Tunnels on Hubei Section of ZhengzhouWanzhou Highspeed Railway
[J]. Tunnel Construction, 2019, 39(1): 157-163.
|
[3] |
QIN Dongchen, ZHOU Peng.
Analysis of Sunk Volume in Shield Construction Process Based on Su AI Channel Project
[J]. Tunnel Construction, 2018, 38(S2): 7-15.
|
[4] |
LYU Qingfeng, HUO Zhensheng, ZHAO Benhai, XIANG Junran, HE Junfeng.
Risk Assessment of Tunnel Collapse Based on Fuzzy Hierarchy and Consequences Equivalent Method
[J]. Tunnel Construction, 2018, 38(S2): 31-38.
|
[5] |
HONG Wenxia, QIAN Jinyu, JIA Minglei.
Risk Assessment of Shield Construction of Qingdao Metro Adjacent to Buildings
[J]. Tunnel Construction, 2018, 38(S2): 68-74.
|
[6] |
XU Zan, XU Zhengshuai, CHEN Xianzhi, XU Xing, GU Zhanghe.
Research on Construction Support Scheme of Superstructure of Opencut Subway Station under the Condition of Shield Machine Driving through a Station
[J]. Tunnel Construction, 2018, 38(S2): 303-309.
|
[7] |
HUANG Tao, LIU Quansheng, HUANG Xing, ZHANG Xiaoping, LU Xinjing.
Research and Development of RealTime Monitoring System forScraper Wear and Laboratory Verification Experimental Test
[J]. Tunnel Construction, 2018, 38(S2): 364-373.
|
[8] |
ZHENG Yongguang, XUE Guangji, CHEN Jinbo, PANG Wenzhuo.
Development, Application and Prospect of Technology of Specialshaped Boring Machine in China
[J]. Tunnel Construction, 2018, 38(6): 1066-1078.
|
[9] |
WANG Jianbo, YOU Weibao, LIU Fangmeng, ZHANG Wei, YANG Diying.
Study of Risk Assessment of Urban Rail Transit PPP Project Based on Improved Entropy Weight and Grey Theory
[J]. Tunnel Construction, 2018, 38(5): 732-739.
|
[10] |
YANG Yuan, WANG Chunsong.
Driving Control Technology for Active Articulated Shield Machine in Moderately Weathered Mudstone in Continuous Small Radius Curve
[J]. Tunnel Construction, 2017, 37(S1): 189-193.
|
[11] |
HONG Wenxia, YANG Fan, WEI Xiaozhao.
Study of Financing Scheme Selection of Metro Projects Based on Risk Assessment
[J]. Tunnel Construction, 2016, 36(7): 782-786.
|
[12] |
LI Dongli, SUN Zhihong, REN Dezhi, SUN Wei.
Study of Application of Eddycurrent Sensor to Disccutter Wear Monitoring System of Shield Machines
[J]. Tunnel Construction, 2016, 36(6): 766-770.
|
[13] |
SUN Zhihong, LI Dongli, ZHANG Jianian.
Wireless Realtime Disc Cutter Wear Monitoring System for Composite Shield Machine
[J]. Tunnel Construction, 2016, 36(4): 485-489.
|
[14] |
LU Ping, ZHENG Gang, ZHANG Wenjun, LEI Huayang.
Study on Risk Assessment and Fined Control of Influence of Shield Tunneling on Ground Surface Settlement: A Case Study on Tianjin Metro
[J]. Tunnel Construction, 2016, 36(2): 170-178.
|
[15] |
GUO Weishe.
Reflecting on Technologies for Shield Tunneling in Heterogeneous Ground
[J]. Tunnel Construction, 2016, 36(10): 1196-1201.
|