[1] |
ZHOU Hongfang.
Experimental Study on Crack Resistance Technology of PVA Synthetic Fiber
Shotcrete with High Elastic Modulus for Muzhailing Highway Tunnel
[J]. Tunnel Construction, 2020, 40(4): 490-495.
|
[2] |
LIN Yonggui, MA Hui, YANG Chunshan.
Crosssection Forms of Super Largespan Opencut Expressway Tunnel
[J]. Tunnel Construction, 2019, 39(S1): 303-309.
|
[3] |
YI Lingbing, LIU Peng, DU Mingfang, LYU Gaole, WANG Ximei, LIU Shenghuan, ZHENG Weifeng, LI Shuaibing, LYU Zhaolong.
Influences of Underground Excavation Section on Highspeed Railway Bridge: a Case Study of Beijing New Airport Line under Crossing Beijing Superlarge Bridge of BeijingShanghai Highspeed Railway
[J]. Tunnel Construction, 2018, 38(S2): 126-135.
|
[4] |
CHEN Bin.
Mining Excavation Technology for Superlarge Crosssection Transition Section of Badaling Great Wall Station
[J]. Tunnel Construction, 2018, 38(S2): 261-267.
|
[5] |
CHEN Jiakang, LIU Shannan, XIAO Xiaochun, WU Jun, LI Lei, WANG Lei.
Study of Determination Method for Slurry Pressure on Excavation Face of Superlarge Slurry Shield Tunnel in Composite Ground
[J]. Tunnel Construction, 2018, 38(4): 619-626.
|
[6] |
NING Jinjin, YUE Yuanzheng.
Study of Operation Window Management and Process Planning for Floating Transportation and Installation of Immersed Tunnel Segment
[J]. Tunnel Construction, 2018, 38(2): 316-320.
|
[7] |
YANG Zhao, SUN Guohua, YANG Qing.
Key Technologies for Receiving of Superlarge Diameter Slurry Shield
[J]. Tunnel Construction, 2017, 37(S1): 116-120.
|
[8] |
WANG Shaohui, CHEN Zhao, JIANG Chong, LONG Haijian, LIU Lin, PENG Xiaolin, SHA Ce.
Comprehensive Treatment Scheme and Construction Technologies for Superlarge Karst Tunnel
[J]. Tunnel Construction, 2017, 37(6): 748-752.
|
[9] |
WANG Jiyun.
Superlarge Diameter Shield Tunneling Technologies in China in Recent Decade
[J]. Tunnel Construction, 2017, 37(3): 330-335.
|
[10] |
WANG Weifu, MEI Zhu.
Study of Application of Bench Method to Shallowburied Asymmetricallypressured Railway Tunnel of Superlarge Crosssection
[J]. Tunnel Construction, 2017, 37(12): 1578-1584.
|
[11] |
ZHU Weidong.
Study of Optimization of Construction Technologies for Superlarge Crosssection Soft Rock Tunnel Based on 3D Numerical Simulation
[J]. Tunnel Construction, 2017, 37(11): 1462-1468.
|
[12] |
WANG Xibin, ZHANG Jin, MA Zhiming, GUAN Ting.
Study of Influence of Freezingthawing Damage on Permeability Behavior of Surface Waterproofing Concrete
[J]. Tunnel Construction, 2016, 36(10): 1216-1220.
|
[13] |
SUN Zhenchuan, WANG Liang.
Case Study on Raise Boring of a Superlarge Diameter Vertical Shaft of Songhuajiang River Water Conveyance Project
[J]. Tunnel Construction, 2015, 35(9): 897-906.
|
[14] |
RONG Liang, YANG Hongjun .
Settlement Control Technology for Tunnel Crossing Underneath Zhongzhou Avenue in Zhengzhou Constructed by Superlarge Rectangular Crosssection Pipejacking Machine
[J]. Tunnel Construction, 2015, 35(12): 1338-1344.
|
[15] |
WEI Longhai, CHENG Yong, LIU Jiguo.
Construction Method of Ultrashallow Superlarge Crosssection Tunnel in Coastal Soft Soil Strata: Case Study on Gongbei Tunnel
[J]. Tunnel Construction, 2015, 35(11): 1141-1149.
|