ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2012, Vol. 32 ›› Issue (增刊2): 141-146.DOI: 10.3973/j.issn.1672-741X.2012.z2.028
Previous Articles Next Articles
TANG Peng
Received:
Revised:
Online:
Published:
Abstract:
The Dalongshan station of NO.6 of Chongqing railway transit is located at the city main road, interfered with large amount of earthwork, complicated tubes and various brace forms. The station is the transit hub of the TBM, and the project is under big pressure. In order to guarantee the main construction scheme and the whole time of the No. 6 railway line construction, and to reduce the cost and influence on surrounding environment, the construction program is optimized and the construction technologies energysaving and emission reduction technologies are improved. The construction scheme and environment requirement are guaranteed, and good social and economic benefits are reached.
Key words: Metro, technical innovation, energysaving and emission reduction
TANG Peng. Environmental Protection and Energy Saving Construction Technologies: Case Study on Dalongshan Station and Tunnel[J]. Tunnel Construction, 2012, 32(增刊2): 141-146.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn.1672-741X.2012.z2.028
http://www.suidaojs.com/EN/Y2012/V32/I增刊2/141
Experimental Effect Prediction of Ground Conditioning of Water rich Sandy Stratum Based on BP Neural Network