ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2012, Vol. 32 ›› Issue (增刊2): 205-209.DOI: 10.3973/j.issn.1672-741X.2012.z2.040
Previous Articles Next Articles
LUO Qing
Received:
Revised:
Online:
Published:
Abstract:
To solve the problem of the need for intensified piles during construction measurement of two isolated and viewblock control position, the layout condition, layout method, calculation method and merit and demerit of nonoriented traverse and several matters need attention in the application nonoriented traverse are analyzed and presented.
Key words: nonoriented traverse, calculation method, merit and demerit
LUO Qing. Study on the Application of Nonoriented Traverse in Intensified Control Net[J]. Tunnel Construction, 2012, 32(增刊2): 205-209.
/ Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn.1672-741X.2012.z2.040
http://www.suidaojs.com/EN/Y2012/V32/I增刊2/205
Deformation and Failure Mechanism of Shallow Inclined-Layered Surrounding Rock Tunnel and Calculation Method of Geological Asymmetrically-Pressurized Load
Effect of Blocked Area on Soil Heat Transfer Characteristic in ExtraLong Power Cable Tunnel