| [1] |
SONG Liuzhuo, XIA Qiang, XU Zhengxuan, ZHANG Qiang, HUANG Teng.
Hydrogeological Parameter Inversion Based on Transient Tunnel Inflow Analytical Solution
[J]. Tunnel Construction, 2026, 46(5): 1028-1038.
|
| [2] |
LEI Mingfeng, LI Changwan, YANG Pengliang, JIA Chaojun, LI Chuitian.
Impact Zoning of Construction Disturbance on Nearby Existing Damaged BuildingsInduced by Foundation Pit of a Metro Station Based on Extended Finite Element Method and Response Surface Method
[J]. Tunnel Construction, 2026, 46(1): 69-79.
|
| [3] |
ZHANG Zhiguo, WAN Qimeng, LI Junjie, NI Yin, JIA Haoran, WEI Jian.
Impact of Deep Foundation Pit Excavation on Existing Metro Stations in Rheological Soft Strata and Reinforcement Effects: A Case Study of Shanghai Jinqiao Metro Over-Track Project
[J]. Tunnel Construction, 2025, 45(S2): 97-106.
|
| [4] |
LIU Xiaogang, SONG Yi, GUO Yanhai, YAO Xilei.
Design of Common Structure Section Between Jinan-Binzhou High-Speed Railway Tunnel and Airport
[J]. Tunnel Construction, 2025, 45(S2): 280-288.
|
| [5] |
WANG Gaoke, CHEN Jianwei, ZHOU Ronghui.
Design Optimization of Support Structures for Small-Sized Working Shaft Foundation Pits in Deep Soft Soil Regions
[J]. Tunnel Construction, 2025, 45(S2): 313-325.
|
| [6] |
LI Daxu, XIE Yu, YANG Xiaofang.
Design of Double-Deck Underground Garage Link Roads Located Beneath Narrow Road Red Line
[J]. Tunnel Construction, 2025, 45(S2): 326-334.
|
| [7] |
JIANG Yajun, ZENG Yaoyi, CAO Danyang, WANG Haizhou, HOU Kaile.
Conceptual Model of Operational Tunnel Leakage Based on Karst Groundwater Movement
[J]. Tunnel Construction, 2025, 45(S2): 390-400.
|
| [8] |
LIN Huasheng, TANG Xinwei, NIE Ding, HUANG Wenmin, SONG Danqing.
Prediction of Deep and Large Shaft Deformation Based
on Multi-Output Machine Learning Model
[J]. Tunnel Construction, 2025, 45(S1): 113-124.
|
| [9] |
XU Youjun, JIN Chenyu, ZHANG Chao, WANG Nan.
Optimization of Counteracting Soil of Parameters a Deep Foundation Pit Close to an Existing Station in Hohhot, China
[J]. Tunnel Construction, 2025, 45(9): 1728-1741.
|
| [10] |
DENG Wenwu, HUANG Dawei, SONG Yi, ZHANG Zhiwei.
Differential Solution for
Longitudinal Deformation of Existing
Shield Tunnel Induced by Upper Excavation of a
Foundation Pit Considering Cross-Sectional Ovalization
[J]. Tunnel Construction, 2025, 45(6): 1120-1130.
|
| [11] |
RONG Chuanxin, TU Zhuo, LONG Wei, ZHANG Runze.
Spatio-Temporal Evolution Pattern and Sensitivity Analysis of Freezing Temperature Field of Shaft in Water-Rich Sand Layer With Groundwater Seepage
[J]. Tunnel Construction, 2025, 45(2): 268-283.
|
| [12] |
RUAN Hengfeng, LIANG Rongzhu, KANG Cheng, LI Zhongchao, CAO Shi′an, DING Zhi.
Elaborate Numerical
Modeling of Metro Shield Tunnel Structure Deformation
Induced by Lateral Foundation Pit Excavation
[J]. Tunnel Construction, 2024, 44(S2): 245-255.
|
| [13] |
YU Weihe, HUANG Zhiqiang, WANG Naiyi, ZHANG Ning.
Application of Improved Pelican Optimization Algorithm-Convolutional Neural Networks-Bidirectional Gated Recurrent Unit Model in Predicting Foundation Pit Dewatering
[J]. Tunnel Construction, 2024, 44(S2): 286-299.
|
| [14] |
ZHANG Jinxun, JIANG Yusheng, YANG Hao, QI Yi, SONG Yongwei, JIANG Hua, YANG Zhiyong.
BasinShaped Freezing Technology for WaterRich Sandy Gravel Strata
[J]. Tunnel Construction, 2024, 44(1): 78-89.
|
| [15] |
HONG Zequn, FU Shuoren, SHI Rongjian, ZHANG Yong, LU Lu, SUN Meng, QIU Peiyun.
Analytical Study of SteadyState
Temperature Field of Local -Freezing and Water Sealing
in Foundation Pit Engineering
[J]. Tunnel Construction, 2024, 44(1): 116-125.
|