ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2014, Vol. 34 ›› Issue (增刊): 311-315.DOI: 10.3973/j.issn.1672-741X.2014.S.049
Previous Articles Next Articles
SUN Cheng, CHEN Yide
Received:
Revised:
Online:
Published:
Abstract:
Deformation occurs to the cutter head of a shield in Dongguan. In the paper, the causes for the deformation of the cutter head are analyzed, which concludes that the eccentric loading on the cutter head causes the deformation of the cutter head. The deformed cutter head is withdrawn, the cracks on the cutter head is cleaned, the deformation of the cutter head is checked, groove is made on the cutter head and welding is made to repair the cutter head. In the end, the deformed cutter head has been repaired successfully. The paper can provide reference for the cause analysis and treatment of deformation of cutter head in the future.
Key words: shield, cutter head, deformation analysis, treatment technology
CLC Number:
U 455
SUN Cheng, CHEN Yide. Analysis on Causes for Deformation of Shield Cutter Head under Complex Geological Conditions and Its Treatment Technology[J]. Tunnel Construction, 2014, 34(增刊): 311-315.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn.1672-741X.2014.S.049
http://www.suidaojs.com/EN/Y2014/V34/I增刊/311
Key Technologies of Cutterhead Configuration and Cutter Replacement for Large diameter Shield under High Water Pressure
Fullscale Experimental Study on Bending Performance of Segmental Joints of Large Crosssection Shield Tunnel under Pure Compressive Bending Condition
Launching and Receiving Technology of Large Crosssection Horseshoeshaped Shield Used in Baicheng Tunnel