ISSN 2096-4498

   CN 44-1745/U

二维码

Tunnel Construction ›› 2015, Vol. 35 ›› Issue (2): 149-159.DOI: 10.3973/j.issn.1672-741X.2015.02.009

Previous Articles     Next Articles

Discussion and Prospects on TBM Pilotheading and Enlarging Method

WANG Lichuan1,2, CHEN Haiyong3, WANG Zhanjun4, XU Runze5, PAN Jianping6, CHEN Hongyu7   

  1. (1. Chengdu Railway Bureau, Chengdu 610082, Sichuan, China; 2. School of Civil Engineering, Central South University, Changsha 410075, Hunan, China; 3. Beijing Construction Co., Ltd. of China Railway Tunnel Group, Beijing 100022, China; 4. Luoyang Mining Machinery Engineering Design Institute, CITIC Co., Ltd., Luoyang 471039, Henan, China; 5. The 2nd Engineering Co., Ltd. of China Railway Construction Bridge Engineering Bureau Group, Shenzhen 518083, Guangdong, China; 6. Sannan Department of China Railway 18th Bureau Group Co., Ltd., Chongqing 400800, China; 7. The First Engineering Co., Ltd. of China Railway Tunnel Group, Chongqing, 401121, China)
  • Received:2014-11-07 Revised:2014-12-18 Online:2015-02-20 Published:2015-02-11

Abstract:

In this paper, the concept and effect of pilotheading method are presented, and the characteristics and applicable conditions of pilotheading method are analyzed. The construction schedules of 3 tunnels located in different geological conditions are simulated in terms of excavation and primary support, and comparison and contrast is made between simulated construction schedules and actual/designed construction schedules. Conclusions drawn are as follows: 1) TBM pilotheading method is not suitable for singletube tunnels located in soft, weak and fractured strata; 2) Instead of other construction galleries, TBM pilotheading method may be adopted for singletube tunnels. 3) Twin TBM pilotheading method is suitable for twintube extralong tunnels, which has advantages in terms of construction schedule, cost and coping with unfavorable geological conditions; 4) TBM pilotheading method is suitable for the construction of tunnels in Sichuan and Chongqing area. Finally, the application of TBM pilotheading method is prospected.

Key words: tunnel, TBM pilotheading, enlarging method, drilling and blasting method

CLC Number: