| [1] |
HAN Sheng.
Experimental Study on
Construction of a Permanent and Temporary Integrated Prefabricated Underground Diaphragm Wall Model
[J]. Tunnel Construction, 2024, 44(S2): 445-451.
|
| [2] |
CHAO Hui, TAN Yong, LIU Tianren.
MesoMechanism of Ground Collapse Induced
by Leaking of Underground
Diaphragm Wall in WaterRich Sandy Strata
[J]. Tunnel Construction, 2023, 43(7): 1180-1189.
|
| [3] |
ZHANG Yuqi, QIU Yunjun, GUO Jiantao, WANG Qiangxun, SU Shouyi, RAO Bangzheng.
Design and Application of PileStyle
Reinforcement for Underground Diaphragm Wall under
Narrow Site Condition
[J]. Tunnel Construction, 2022, 42(S1): 389-395.
|
| [4] |
YUAN Peng, WEI Lifeng, HE Xiaobin.
Deformation Control of Pile Foundation Laterally
Crossed by a SuperLargeDiameter
Shield near Yellow River Embankment: a Case Study of
Yellow Rivercrossing Tunnel on Jiluo Road in Jinan,
China
[J]. Tunnel Construction, 2022, 42(5): 907-916.
|
| [5] |
NIU Ruoxin, DONG Haizhou.
Experimental and Numerical Simulation of PumpingTracing
Method for Detecting Leakage in Underground Diaphragm
Wall
[J]. Tunnel Construction, 2022, 42(11): 1889-1897.
|
| [6] |
CHEN Jinming, WU Qiang, YANG Xinying, SHU Kaibo, YU Guohua.
Deformation Monitoring and Analysis of a New Composite
Retaining Structure
for Deep Foundation Pit of a Station Adjacent to a River
[J]. Tunnel Construction, 2021, 41(S1): 89-.
|
| [7] |
WANG Weijun, YANG Weihua, LIU Meng, LIU Wei.
Adaptability of Remanufactured Shield Boring
underneath Piles of a Viaduct
[J]. Tunnel Construction, 2021, 41(4): 666-673.
|
| [8] |
RAN Haijun, ZHANG Wenxin, NIU Zhanwei, PENG Qi, XIANG Yixiong, LI Yuntao, GAO Guangyi.
Application and Analysis of Singlelayer
Fiberglass Mesh in Reception of Super large Diameter Shield: a Case
Study on Shield
Tunnel of Su′ai Channel
[J]. Tunnel Construction, 2020, 40(S2): 233-240.
|
| [9] |
FANG Youliang, LU Zhiren, WANG Jin, FU Qiao, ZI Xiaoyu, LIAN Zheng.
Safety Support Technology for Ultra-deep Foundation Pit Based on Support Servo Combined System
[J]. Tunnel Construction, 2019, 39(S2): 120-128.
|
| [10] |
LI Genxi, WANG Lishuai, CHEN Wenpeng, ZHANG Baobao.
Experimental Study on Bonding Behavior between GFRP Bars and Concrete
[J]. Tunnel Construction, 2019, 39(S2): 129-134.
|
| [11] |
LI Ming, WU Bo, ZHANG Huanming, ZHOU Peng.
Estimation Method of Underground Diaphragm Wall Bending Moment Based on Wavelet Denoising
[J]. Tunnel Construction, 2018, 38(S2): 120-125.
|
| [12] |
ZHANG Zhiguo, XI Xiaoguang, WU Ling.
Numerical Simulation and Site Monitoring Analysis of Influence of Division Excavation of Foundation Pit on Adjacent Largediameter Rivercrossing Tunnel
[J]. Tunnel Construction, 2018, 38(9): 1480-1488.
|
| [13] |
ZHU Jihong, ZHANG Wenxin, ZHANG Lianghui.
Study of Construction Technology for Diaphragm Wall under Complex Geological Conditions in Sea Cofferdam
[J]. Tunnel Construction, 2018, 38(9): 1554-1559.
|
| [14] |
WEI Qingcen, ZHANG Junru, HE Jixiang.
Key Underpinning Technology for Pile Foundation of Existing Viaduct Beam in Superwide Deep Foundation Pit of Metro Station
[J]. Tunnel Construction, 2018, 38(6): 1014-1021.
|
| [15] |
ZHAN Tao, YANG Chunbo, AN Bin.
Rapid Grooving Technology of Doublewheel Trench Cutter Used in Argillaceous Siltstone Stratum
[J]. Tunnel Construction, 2018, 38(12): 2019-2025.
|