Tunnel Construction ›› 2015, Vol. 35 ›› Issue (S1): 1-4.DOI: 10.3973/j.issn.1672-741X.2015.S1.001
Next Articles
FU Qingwen, CUI Genqun, LIU Xinpeng
Received:
Revised:
Online:
Published:
Abstract:
For the purpose of preparing a scientific construction schedule management for Phase I Project of Line 1 of Shijiazhuang Metro, it is hereby to conclude the experience regarding the general planning, measures and method for schedule control & technology management, to make sure that all works incorporated in the Metro construction could be advanced collaboratively, efficiently and timely in accordance with the targeted milestone as stipulated in the contract.
Key words: Metro, construction schedule, planning, progress target, scheduling, technology management
CLC Number:
U 45
FU Qingwen, CUI Genqun, LIU Xinpeng. Overall Construction Schedule Planning and Management Technology for Phase I Project of Line 1 of Shijiazhuang Metro[J]. Tunnel Construction, 2015, 35(S1): 1-4.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn.1672-741X.2015.S1.001
http://www.suidaojs.com/EN/Y2015/V35/IS1/1
Experimental Effect Prediction of Ground Conditioning of Water rich Sandy Stratum Based on BP Neural Network