[1] |
HUANG Zhangjun, YANG Yanling, TANG Dongsang, ZHANG Weizhong.
Numerical Simulation and Monitoring of Reaction Wall
of Launching Shaft for Large Rectangular Pipe Jacking
[J]. Tunnel Construction, 2020, 40(7): 972-980.
|
[2] |
陈伟乐, 宋神友, 金文良, 夏丰勇.
Plan and Practice of Intelligent Construction System of SteelConcreteSteel Composite Immersed Tunnel of ShenzhenZhongshan Link
[J]. Tunnel Construction, 2020, 40(4): 465-474.
|
[3] |
CHEN Zijian, YAN Zihai, GAN Penglu, ZUO Kaihua.
Improved Fuzzy Probability Model of Tunnel Surrounding Rock
Stability and Its Application
[J]. Tunnel Construction, 2020, 40(4): 504-511.
|
[4] |
陈 越, 陈伟乐, 宋神友, 刘 健, 金文良.
深中通道沉管隧道主要建造技术
[J]. Tunnel Construction, 2020, 40(4): 603-610.
|
[5] |
WANG Kun, YE Lei, CHENG Yonglong, GAO Wenliang, ZHANG Shuqi, ZHENG Liangkui .
Sealing Device for Launching and Receiving of Tunneling Machine for Connection Gallery with Mechanical Excavation Method
[J]. Tunnel Construction, 2020, 40(1): 134-142.
|
[6] |
ZHANG Yunhong, JI Xinyou, REN Yong.
Overview of Songduo Tunnel Route Scheme Design
[J]. Tunnel Construction, 2019, 39(S2): 261-268.
|
[7] |
WANG Zhijie, TANG Li, JIANG Xinzheng, HOU Weiming, XU Haiyan, JI Xiaofeng.
Model Test on Stability of Large Crosssection Highway Tunnel Adjacent to Caverns
[J]. Tunnel Construction, 2019, 39(S1): 16-24.
|
[8] |
LI Hongzhe, JIANG Guodong, ZHANG Guozhu, LIU Yiping.
Consideration on Common Diseases of Immersed Tunnel and Its Inspection and Maintenance
[J]. Tunnel Construction, 2019, 39(S1): 465-470.
|
[9] |
DAI Cong, HE Chuan, LIU Chuankun, GUO Wenqi.
Influence of Pipe Roof Layout Range on Stability of Surrounding Rock of Soft Rock Tunnel
[J]. Tunnel Construction, 2019, 39(9): 1437-1444.
|
[10] |
ZHU Hanhua, WU Zhijun, WANG Yingchao, DING Zhi.
Restudy on Equilibrium and Stability Theory of Underground Engineering
[J]. Tunnel Construction, 2019, 39(8): 1221-1231.
|
[11] |
LIU Tongjiang, TANG Gang, WANG Jun, SUN Yafei.
Treatment Technology of Giant Karst Cave of Gaoshan Tunnel on QianjiangZhangjiajieChangde Railway
[J]. Tunnel Construction, 2019, 39(6): 972-982.
|
[12] |
GAO Qiao, MA Ke, TANG Chun′an, MA Tianhui.
Microseismicity and Stability of Underground Powerhouse at Huanggou Pumpedstorage Power Station Subjected to Excavation
[J]. Tunnel Construction, 2019, 39(5): 775-782.
|
[13] |
WANG Min, LIU Xiaodong, HAO Zengheng, LYU Yonggang.
Structure Design and Application of Asphalt Pavement to Hong KongZhuhaiMacao Bridge Immersed Tunnel
[J]. Tunnel Construction, 2019, 39(5): 802-809.
|
[14] |
LIN Yonggui, YANG Chunshan.
Support Scheme Evaluation and Influencing Factors on Cellular Diaphragm Wall for Drydock Foundation of Immersed Tunnel
[J]. Tunnel Construction, 2019, 39(4): 571-575.
|
[15] |
CHENG Peng, GAO Yi, YU Shaohui, LI Yang.
Safety Analysis of Structure System of Structural Cut and Convert Method
[J]. Tunnel Construction, 2019, 39(3): 435-443.
|