[1] |
TANG Honghui, WEI Lixin, XU Zhisheng, ZHAO Jiaming, YU Zihan, WANG Juan, XIE Yiqiang.
Opening Strategy of Middle
and Long Distance Immersed Tunnel Ventilation Fans in Urban Areas and Distribution Pattern of Pollutants
[J]. Tunnel Construction, 2024, 44(S1): 71-81.
|
[2] |
HUANG Weizhen, HE Cong, XU Guoyuan, LI Baijian.
Seismic Response of a Submarine Immersed Tunnel Under
Oblique Incidence of SV Waves
[J]. Tunnel Construction, 2024, 44(4): 724-738.
|
[3] |
GUO Yawei, JIN Wenliang, SONG Shenyou, FU Baiyong.
Impact of Concrete Void Repair on Mechanical
Performance of
Angle Steel Connectors
[J]. Tunnel Construction, 2024, 44(3): 526-534.
|
[4] |
WEI Lixin, OU Zhenfeng, LIU Liying, YANG Chunshan.
Review on Innovative Technology for Immersed Tunnel
Construction in Central Urban Area of Guangzhou
[J]. Tunnel Construction, 2023, 43(S2): 1-9.
|
[5] |
JIN Wenliang, SONG Shenyou, WU Wangjie, LIU Jian, ZHANG Shuangjiao, BAO Rui.
Material Design and Deformation Performance of
Seamless Expansion Joint of Immersed Tunnel
[J]. Tunnel Construction, 2023, 43(S2): 197-207.
|
[6] |
XU Yu, LIU Minghu, XU Guoping, WANG Yong.
Key Technologies of Antireaction of Onland Final Joint
of Hanjiang RiverCrossing Immersed Tunnel in
Yuliangzhou, Xiangyang, China
[J]. Tunnel Construction, 2023, 43(S2): 451-459.
|
[7] |
LIU Shaopeng.
Research and Application of Fast Generation and
Transformation of BIMANSYS
Model in Immersed Tunnel
[J]. Tunnel Construction, 2023, 43(S2): 467-476.
|
[8] |
SHAN Lianjun, GUO Jianmin, NI Pengpeng, LI Jianfeng, MA Huihuan, SUN Wei.
Review on Development of Joint Type and Deformation
Mechanism of
Immersed Tunnel
[J]. Tunnel Construction, 2023, 43(S1): 14-24.
|
[9] |
ZENG Bocun, FENG Jiangdong, ZHOU Xingtao, WANG Cong, SUN Xiaowei, REN Yaopu.
Innovation and Practice of Key Technologies for
Immersed Tunnel
Terminal Joint Based on Friction Antithrust
[J]. Tunnel Construction, 2023, 43(5): 847-855.
|
[10] |
FENG Xiandao, WANG Cong, SUN Xiaowei, ZENG Bocun.
Design and Application of Secondary Cofferdam
Structure at Onshore Final Joint
of Immersed Tunnel: a Case Study of Yuliangzhou Section
[J]. Tunnel Construction, 2023, 43(4): 665-673.
|
[11] |
XIA Qiaowang, JIN Wenliang, HE Chunning.
Influence of Measuring Tower Offset During
Installation of LongandLarge
Immersed Tunnel Element
[J]. Tunnel Construction, 2022, 42(S2): 220-224.
|
[12] |
ZENG Bocun, CAO Linxiang, ZHOU Xingtao, SUN Xiaowei, WANG Cong, HU Jiayi.
Research and Application of Assembled Steel Bulkhead
for Hanjiang Immersed Tunnel in Xiangyang, China
[J]. Tunnel Construction, 2022, 42(9): 1605-1614.
|
[13] |
GUO Jianmin, SHAN Lianjun.
Structure Type and Prefabrication Scheme of Immersed
Tunnels in Urban Core Areas: a Case Study of Pazhou
West Tunnel Project in Guangzhou, China
[J]. Tunnel Construction, 2022, 42(11): 1906-1912.
|
[14] |
WANG Zhan, ZHANG Baohu, ZHANG Yanmeng, GUO Qiang, SUN Hong.
Damage and Deformation of Chebei Road Immersed Tunnel
Based on Multiple
Lateral Differential Foundation Stiffness
[J]. Tunnel Construction, 2021, 41(S2): 209-214.
|
[15] |
XU Yu, XU Guoping, FU Baiyong, HE Xiao.
Foundation Settlement Control Analysis of Immersed
Tunnel at
Connection between Offshore Artificial Island and Tunnel
[J]. Tunnel Construction, 2021, 41(S1): 338-.
|