ISSN 2096-4498
CN 44-1745/U

Tunnel Construction ›› 2016, Vol. 36 ›› Issue (4): 451-457.DOI: 10.3973/j.issn.1672-741X.2016.04.013
Previous Articles Next Articles
WANG Shan’gao1, SHI Shibo2,*, SHU Heng2, GAO Fanding2, LI Dongsheng2
Received:
2015-11-09
Revised:
2016-03-04
Online:
2016-04-20
Published:
2016-04-27
CLC Number:
WANG Shan’gao, SHI Shibo, SHU Heng, GAO Fanding, LI Dongsheng. Precasting Technologies for Internal Structure of Singletube Doubledeck Extralong Shield Tunnel: A Case Study on Yangtze Rivercrossing Shield Tunnel on Weisan Road in Nanjing[J]. Tunnel Construction, 2016, 36(4): 451-457.
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn.1672-741X.2016.04.013
Viewed | ||||||
Full text |
|
|||||
Abstract |
|
|||||
Support by Beijing Magtech Co.ltd support@magtech.com.cn