Tunnel Construction ›› 2016, Vol. 36 ›› Issue (4): 451-457.DOI: 10.3973/j.issn.1672-741X.2016.04.013

Previous Articles     Next Articles

Precasting Technologies for Internal Structure of Singletube  Doubledeck Extralong Shield Tunnel: A Case Study on Yangtze  Rivercrossing Shield Tunnel on Weisan Road in Nanjing

WANG Shan’gao1, SHI Shibo2,*, SHU Heng2, GAO Fanding2, LI Dongsheng2   

  1. (1. Nanjing Weisan Road Rivercrossing Tunnel Construction Headquarters, CCCC, Nanjing 210056, Jiangsu, China;  2. CCCC Second Highway Consultants Co., Ltd., Wuhan 430056, Hubei, China)
  • Received:2015-11-09 Revised:2016-03-04 Online:2016-04-20 Published:2016-04-27

Abstract:

The construction distance of the singletube doubledeck rivercrossing shield tunnel on Weisan Road in Nanjing is long; the construction space is limited; and the construction schedule is tight. As a result, the precasting technologies for the internal structure of the tunnel are studied; and then the beamdeckcolumn structure system by means of castinsitu and precast and rational construction procedure are adopted. Finally, the rational construction scheme of singletube doubledeck extralong shield tunnel is adopted. The construction practice shows that the technologies used can improve the construction efficiency greatly, shorten the construction schedule and reduce the cost.

Key words: Nanjing Weisan Road Rivercrossing Tunnel, doubledeck shield tunnel, internal structure, precast structure