ISSN 2096-4498

   CN 44-1745/U

二维码

Tunnel Construction ›› 2016, Vol. 36 ›› Issue (7): 877-880.DOI: 10.3973/j.issn.1672-741X.2016.07.018

Previous Articles     Next Articles

Application and Management of Cutting Tools of Large Slurry Shield in Rivercrossing Tunnels

JI Yuguo, YANG Rongbin   

  1. (Shanghai Jiantong Engineering Consulting & Construction Co., Ltd., Shanghai 200031, China)
  • Received:2016-02-17 Revised:2016-03-20 Online:2016-07-20 Published:2016-07-27

Abstract:

The application of cutting tools of shield in complex strata of Nanjing Yangtze Rivercrossing Tunnels and Nanjing Rivercrossing Metro Line No. 3 and Line No. 10 is analyzed and summarized. And then the initial design, application and management, cutting tool checking and replacing, incident prevention and boring recovery of cutting tool management are proposed, so as to improve the application and management of cutting tools of large slurry shield in China. The results can provide reference for application and management of cutting tools of shield in similar projects in the future.

Key words: rivercrossing tunnel, slurry shield, cutting tool, application and management

CLC Number: