Abstract:
The stateoftheart of the mechanization of tunnel construction is presented. The problems, i.e. lack of professional researching and manufacturing company of tunnel construction equipment in China, unbalance of tunnel construction mechanization, inadequate use or abandon of some largescale equipment and lack of feasible equipment for special projects, are pointed out. The construction mechanization level of some key tunnels in comment surrounding rocks in China can meet the construction requirements, and that of some tunnels in bad surrounding rocks varies much. The author suggests that the researching and manufacturing of construction equipments are very important for related presupport technology. Some tunnel construction equipments used in Japan, including equipments related to surrounding rock strengthening or presupport, i.e. steel pipe advance support dedicated drilling and grouting machines, hydraulic rock drilling jumbos and bending drilling machines, equipments which can improve construction efficiency, i.e. drilling machines and shotcrete machines, invert trestles (single span, double span and triple span) and intensive construction machines, i.e. multiboom TWS for Tunnel Work Station and removable powerful ventilation fans, are introduced emphatically. It is very important to improve the tunnel construction mechanization level, shorten the construction schedule and guarantee the construction quality. The construction mechanizations of TBM method and shield method have been achieved and it should be also the trend for mining method.
Key words: tunnel, mining method, equipment, construction mechanization
CLC Number:
U 45
GUAN Baoshu. Tunneling by Mining Method: Lecture XXI: Mechanization of Tunnel Construction[J]. Tunnel Construction, 2016, 36(10): 1163-1170.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn.1672-741X.2016.10.001
http://www.suidaojs.com/EN/Y2016/V36/I10/1163
Key Technologies of Cutterhead Configuration and Cutter Replacement for Large diameter Shield under High Water Pressure
Experimental Effect Prediction of Ground Conditioning of Water rich Sandy Stratum Based on BP Neural Network
Fullscale Experimental Study on Bending Performance of Segmental Joints of Large Crosssection Shield Tunnel under Pure Compressive Bending Condition
Study on Optimization of Emergency Rescue Station of Yuntunbao Tunnel on ChengduLanzhou Railway
Launching and Receiving Technology of Large Crosssection Horseshoeshaped Shield Used in Baicheng Tunnel
Design and Analysis of a New TBM Propulsion System with Small Turning Radius
Study on Key Technologies and Application of Engineering Big Data Management Platform of Tunnel Boring Machine