| [1] |
DU Chuangdong, DU Yihang, HUANG Xiaofu.
Control Technology for
Segment Dislocation and Attitude
of Large-Diameter Shield Tunnels
[J]. Tunnel Construction, 2024, 44(7): 1510-1519.
|
| [2] |
GUAN Zhenchang, XIE Lifu, ZHOU Yuxuan, LUO Song, XU Chao.
Prediction Model and
Control Method for Shield Attitude Based
on Machine Learning
[J]. Tunnel Construction, 2024, 44(10): 2032-2040.
|
| [3] |
GUO Ping, SU Jian, DUAN Taisheng, WANG Kaosheng, GUO Runqiu, SUN Xiaolei, ZHANG Xiaobo.
Comparison and Application of Tunnel Continuous Ultra-Short
Edge Traverse
Measurement Methods
[J]. Tunnel Construction, 2023, 43(S1): 391-397.
|
| [4] |
JIAN Peng, YANG Chen, YOU Yusong, JING Liujie, ZANG Jiaqi, XU Shoutian.
Research and Application of Automatic Control
Technology for Shield Tunneling Attitude
[J]. Tunnel Construction, 2023, 43(10): 1795-1800.
|
| [5] |
WANG Guangke, WANG Zhengbang, CHEN Guangjin, FU Hongping.
Discussion on Application of a Gyroscopic Coordinate
Azimuthal Constraint in CPⅡ Traverse Adjustment Prior to Longtunnel Breakthrough
[J]. Tunnel Construction, 2021, 41(1): 60-66.
|
| [6] |
DING Erwei, LI Na, WANG Yesheng, LIU Jingjie.
Cause Analysis of Postural Deviation due to Improper Setting of Shield Zone Pressure
[J]. Tunnel Construction, 2019, 39(S1): 125-130.
|
| [7] |
LI Hui, HAN Ziqiang, CHEN Peng.
Application of Transient Electromagnetic Method in Groundwater Prediction of Highway Tunnel
[J]. Tunnel Construction, 2019, 39(S1): 355-360.
|
| [8] |
YANG Zhiyong, YANG Xing, JIANG Yusheng, WANG Dong, ZHENG Yaofu, DING Yaowen .
Construction Control Technology of Shield Overcrossing Adjacent Existing Operation Tunnel
[J]. Tunnel Construction, 2019, 39(11): 1898-.
|
| [9] |
XIA Caichu, NA Tongxing, PENG Guocai, CHEN Zhongqing.
Discussion on Deformation Monitoring Accuracy of Highway Tunnel Construction
[J]. Tunnel Construction, 2016, 36(5): 508-512.
|
| [10] |
HU Dehua, DUAN Jingchuan.
Study on Characteristics of Deformation of Adjacent Pile Foundations Caused by Shield Boring
[J]. Tunnel Construction, 2015, 35(5): 413-418.
|
| [11] |
DIAO Yi.
Application and Management of PPS Guidance System of TBM
[J]. Tunnel Construction, 2010, 30(1): 63-66,96.
|
| [12] |
PI Jing-Kun, Diao-Yun-Chen.
Causes and Countermeasures for Segment Uplift of Shieldbored Tunnels
[J]. Tunnel Construction, 2009, 29(6): 616-618.
|
| [13] |
JU Yong.
Analysis on Control Survey of Long Metro Tunnels
[J]. Tunnel Construction, 2006, 26(增刊2): 27-29.
|
| [14] |
XIE Jun-Liang, Zhang-Liang-Hui, Yang-Xiao-Beng.
Application of New Construction Technologies in ChiLu Running Tunnel Works on Line 2 of Guangzhou Metro
[J]. Tunnel Construction, 2006, 26(增刊2): 33-36.
|