Tunnel Construction ›› 2017, Vol. 37 ›› Issue (S1): 86-90.DOI: 10.3973/j.issn.1672-741X.2017.S1.014

Previous Articles     Next Articles

Discussion on Structural Design of Connection Interface between Opencut Metro Station and Ventilation Duct

GUO Zhengwei, XIA Mengran, ZHANG Yuebo   

  1. (Zhengzhou Institute of China Railway Engineering Consulting Group Co., Ltd., Zhengzhou 450000, Henan, China)
  • Received:2017-02-17 Revised:2017-04-20 Online:2017-05-20 Published:2017-05-27

Abstract:

The structural design of connection interface between opencut metro station and ventilation duct is discussed and analyzed in terms of structural arrangement and antifloating. The authors recommend that: 1) The arrangement of deformation seams and the design of beamcolumn system at connection interface should be strengthened and optimized and rational parameters should be adopted so as to guarantee the safety of the structure. 2) The antifloating calculation and antifloating measures should be strengthened for main structure at connection interface with high groundwater level. The relevant design of reserved interface are discussed as well.

Key words: opencut method, metro station, tnterface of ventilation duct, structural arrangement, antifloating, deformation seam, reserved interface

CLC Number: