ISSN 2096-4498

   CN 44-1745/U

二维码

Tunnel Construction ›› 2017, Vol. 37 ›› Issue (8): 958-965.DOI: 10.3973/j.issn.1672-741X.2017.08.007

Previous Articles     Next Articles

Experimental Study of Construction Ventilation of Qamchiq Tunnel on AngrenPop Railway in Uzbekistan

ZHANG Zhongai1, XIONG Wenan2, JING Guirong3   

  1. (1. The First Engineering Co., Ltd. of China Railway Tunnel Group, Chongqing 401123, China; 2. China Railway Tunnel Stock Co., Ltd., Zhengzhou 450000, Henan, China; 3. Guangyuan Lizhou Secondary Specialized School, Guangyuan 628000, Sichuan, China)
  • Received:2016-12-20 Revised:2017-05-22 Online:2017-08-20 Published:2017-08-22

Abstract:

The experiment and test are carried out for ventilation system at entrance section and working environment of Qamchiq Railway Tunnel so as to test the ventilation effect of ventilation system, learn the basic knowledge of ventilation equipments and provide correct design parameters for optimization and adjustment of ventilation system. The results show that the ventilation effect and ventilation system maintenance at entrance section of Qamchiq Tunnel are good.

Key words: Qamchiq Tunnel, construction ventilation, ventilation system, working environment, experiment

CLC Number: