| [1] |
GUO Defu, ZHANG Jingli, FANG Yuzhong, LYU Peilin, DI Huijie, ZHANG Hao, YANG Chen.
Practice and Innovation of Continuous Caisson Construction Technology for Underground Railway Stations in Jiaxing, China
[J]. Tunnel Construction, 2025, 45(8): 1577-1589.
|
| [2] |
HU Tianbo, XU Junlin, JIANG Jiafei, PAN Zhengyi, XUE Weichen, MAO Lianggen.
Pushover Analysis of a Prefabricated Column-Supported
Underground Station Using Steel-to-Sleeve Connections with Overflowed Grout
[J]. Tunnel Construction, 2025, 45(5): 933-943.
|
| [3] |
HONG Chengyu, LIN Kaizhe, RAO Wei, CHEN Xiangsheng, QIU Tong, ZHANG Bin, DAI Ji, JIA Ke.
Monitoring Analysis of
Mechanical Characteristics of Prefabricated Structures of an Underground Metro Station During Construction Process
[J]. Tunnel Construction, 2025, 45(3): 511-520.
|
| [4] |
ZHANG Zhongjie, LYU Peilin, YU Jian, GUO Zhenkun, ZHANG Qingyu, WANG Haoran.
Key Techniques of Constructing Underground Stations Using
Continuous Open Caisson Method
[J]. Tunnel Construction, 2024, 44(3): 554-563.
|
| [5] |
HONG Chengyu, RAO Wei, WU Chenggang, DAI Ji, JIA Ke.
Machine VisionBased Monitoring and Safety Assessment
of Prefabricated Underground Stations
[J]. Tunnel Construction, 2023, 43(S2): 215-222.
|
| [6] |
WANG Tongjun, MA Weibin, WANG Yong.
Key Technologies for Construction and Operation of Badaling Great Wall Underground Station on Beijing-Zhangjiakou HighSpeed Railway
[J]. Tunnel Construction, 2023, 43(1): 1-16.
|
| [7] |
HUANG Jiefang, HUANG Mingli, TAN Zhongsheng.
Phased Control Standards of Primary Support
Deformation of East Tianshan Tunnel Crossing Fault Fracture Zone
[J]. Tunnel Construction, 2022, 42(S1): 155-165.
|
| [8] |
YAN Weiyao, DING Hongzhi, ZHOU Quan.
Stress Characteristic Analysis and Discussion of
Deformation Control Value of Underwater Shield Tunnel: a
Case Study of Jiajiang
Underwater
Shield Tunnel in Nanjing, China
[J]. Tunnel Construction, 2022, 42(5): 863-872.
|
| [9] |
PENG Zhiyong, YANG Xiuren, HUANG Meiqun, LIN Fang, YANG Ming.
Mechanical Behavior of Prefabricated Underground Station
Structure in Construction Stage
[J]. Tunnel Construction, 2022, 42(3): 398-405.
|
| [10] |
TAO Lianjin, HUANG Linkun, SHI Cheng, ZHANG Naijia.
Deformation Control Standards for Super-Large-Span Flat Underground Cavern
[J]. Tunnel Construction, 2022, 42(1): 9-15.
|
| [11] |
CAI Ming, SU Nan.
Design for Transferring between New Underground
Station and Existing Elevated Station: Taking Yangjiaping Station in Chongqing as an Example
[J]. Tunnel Construction, 2021, 41(S2): 445-451.
|
| [12] |
YANG Zhao, LI Yongzhi, YANG Rui.
Analysis on Cracks of Cast-in-Place Utility Tunnel Induced by Uneven Settlement:
a Case Study of Utility Tunnel of Fuzhou Southeast Freeway
[J]. Tunnel Construction, 2021, 41(12): 2098-2105.
|
| [13] |
JIANG Yao, LI Kui, HU Wei, TAN Xinrong.
Study on Influence of Aerodynamic Effect on Semiunderground Station of Highspeed Railway
with 350 km/h
[J]. Tunnel Construction, 2020, 40(S1): 187-193.
|
| [14] |
ZHAO Yong, YU Zufa, CAI Jue, LYU Gang, LIU Jianyou, YUE Ling.
Design Concept and Implementation Path for Badaling
Great Wall Station of BeijingZhangjiakou Highspeed Railway
[J]. Tunnel Construction, 2020, 40(7): 929-940.
|
| [15] |
DU Chuangdong, ZHANG Jie, WU Yuebin.
Application of Construction Technology of "Tunneling First and Then Station"
in Tel Aviv Red Line Project in Israel
[J]. Tunnel Construction, 2020, 40(4): 562-568.
|