ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2018, Vol. 38 ›› Issue (5): 873-878.DOI: 10.3973/j.issn.2096-4498.2018.05.023
Previous Articles Next Articles
ZHAO Xiaofeng, GAI Chen, ZHANG Haoqi
Received:
Revised:
Online:
Published:
Abstract:
During construction of fullface tunnel lining with formwork trolley, initial positioning of formwork trolley and cavity monitoring behind lining are considered to be two difficulties. The formwork trolley usually adopts manual measurement method, i.e. combining use of hanging lead drop and total station, which is sophisticated and often relies on construction experience. To avoid the disadvantages of traditional method, such as low efficiency, being dangerous, and often resulting in crown top structure damage in slurry replenishing, a new control system combining both functions of laser positioning and cavity monitoring is designed and the related construction scheme is introduced respectively. The control system has high precision laser sensor to fix the formwork trolley and adopts electrode liquid level sensor to test holes. In addition, related information software equipped with the function of video monitoring, synchronous data, etc., makes to realize data transmission and manmachine interaction.
Key words: formwork trolley, laser positioning, cavity monitoring
CLC Number:
U 455.3+9
ZHAO Xiaofeng, GAI Chen, ZHANG Haoqi. Design and Application of Positioning and Cavity Monitoring System of Formwork Trolley[J]. Tunnel Construction, 2018, 38(5): 873-878.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn.2096-4498.2018.05.023
http://www.suidaojs.com/EN/Y2018/V38/I5/873