[1] |
KONG Desen, TENG Sen, ZHAO Mingkai, SHI Jian.
An Improved ThreeDimensional Model of Shield
Tunnel Face and Its Stability Study
[J]. Tunnel Construction, 2023, 43(9): 1463-1472.
|
[2] |
CAO Yong, YANG Chuan, QIU Wenge, WANG Xianhao, BAI Hengbin, LING Peng.
Calculation Method for Jv Value Based on Three-Dimensional Geometric Image of Tunnel Face
[J]. Tunnel Construction, 2023, 43(9): 1492-1500.
|
[3] |
CHEN Haijun, ZHANG Juwen, SUN Zhibin, FU Helin.
Reliability Study of Shield Tunnel Face Based on UpperLimit Analysis
and Random Response Surface Method
[J]. Tunnel Construction, 2022, 42(7): 1177-1186.
|
[4] |
LI Ao, ZHANG Dingli, SUN Zhenyu, DONG Fei, HUANG Jun.
Tunnel Collapse Mechanism and Control Based on Virtual
Support Force Characteristic
of Surrounding Rock
[J]. Tunnel Construction, 2022, 42(7): 1239-1247.
|
[5] |
LIU Ke.
Key Design Technology for Large Cross-Section
Mechanized Construction of Mountainous Tunnels
[J]. Tunnel Construction, 2022, 42(4): 703-713.
|
[6] |
QI Mengxue, YANG Guoqing, ZENG Shaoyi.
Review and Analysis of Advanced Treatment Techniques
for FullFace Tunnel Boring Machine Construction
[J]. Tunnel Construction, 2021, 41(9): 1555-1564.
|
[7] |
WEI Xiaolong, LIN Fulong, MENG Xiangbo, ZHOU Shuliang, GUO Junke.
Real Time Diagnosis Application of Disc
Cutter in Super Large Diameter Slurry Shield: a Case Study on Shantou Su′ai
Tunnel
[J]. Tunnel Construction, 2021, 41(5): 865-870.
|
[8] |
CHEN Dengkai, ZHONG Jiuqiang, YU Zhiyong, JIANG Yalong, ZHU Bitang.
Research on Upper Limit Support Pressure of Shallow
Tunnel Face in Composite
Strata Based on Limit Analysis
[J]. Tunnel Construction, 2021, 41(10): 1708-1716.
|
[9] |
童建军, 刘大刚, 张霄, 王志龙, 赵思光, 李佳旺.
Design Method for Support Structure of Large Crosssection Tunnels in Hubei on ZhengzhouWanzhou
Railway Constructed by Mechanized Means
[J]. Tunnel Construction, 2021, 41(1): 116-125.
|
[10] |
LI Tao, QIU Wenge, LIU Yi.
Development and Application of Refined Management System of Tunnel Geological Information Based on Data Drive
[J]. Tunnel Construction, 2019, 39(1): 68-74.
|
[11] |
WANG Zhijian.
Research on Key Technology of Large Crosssectional Mechanized Construction of ZhengzhouWanzhou Highspeed Railway Tunnel
[J]. Tunnel Construction, 2018, 38(8): 1257-1270.
|
[12] |
WANG Mingnian, DENG Tao, YU Li.
Study of Theoretical Prediction Method for Construction Ventilation Time Required for Largesectional Highspeed Railway Tunnel
[J]. Tunnel Construction, 2018, 38(8): 1279-1285.
|
[13] |
LIU Dagang, YAO Meng, ZHANG Xiao.
Stability Evaluation and Control Measures for Tunnel Face of Large Crosssectional Tunnel on ZhengzhouWanzhou Highspeed Railway
[J]. Tunnel Construction, 2018, 38(8): 1311-1315.
|
[14] |
XIONG Ziming, DONG Xin, WANG Mingyang, ZHANG Qinghua, MA Chao.
Research on 3D Reconstruction Technology for Rock Mass Structure Based on ASIFT Algorithm and RANSAC Algorithm
[J]. Tunnel Construction, 2017, 37(7): 808-815.
|
[15] |
DENG Tao, LIU Dagang, CAI Minjin, ZHAO Siguang, HE Wei.
Optimization Analysis of Geometric Parameters of Bench Method Used in Zhongtiaoshan Tunnel
[J]. Tunnel Construction, 2017, 37(12): 1550-1556.
|