| [1] |
WANG Jie, CHENG Guolong, ZHOU Bing, HU Wei, TAN Houjun, XIE Jianhong.
Safety Risk Evaluation of
Long-Distance Small-Diameter Tunnel Bored by Tunnel Boring
Machine
[J]. Tunnel Construction, 2024, 44(S2): 211-223.
|
| [2] |
LIU Chengwen, LIU Gang, XU Hua, DING Guopeng.
Mechanism and Risk
Assessment of Water and Mud Inrush in Water-Rich
Section With Tertiary Semi-Diagenetic
Sandstone and Mudstone in Wangjiazhai Tunnel
[J]. Tunnel Construction, 2024, 44(S1): 139-148.
|
| [3] |
LI Jing, WU Hailong, HE Qiantu, LIN Chungang.
Scheme Design of Trolley for Disease Control of
Operational Railway Tunnel Based on Analytic Hierarchy
ProcessTRIZ
[J]. Tunnel Construction, 2024, 44(4): 801-809.
|
| [4] |
QIN Yawei, TAN Yi, JU Wanglai, CHEN Bin.
Collapse Risk Assessment of Mountain Tunnels Based on
SetPair Analysis Theory and Digital Platform
[J]. Tunnel Construction, 2024, 44(3): 475-483.
|
| [5] |
HONG Zequn, FU Shuoren, SHI Rongjian, ZHANG Yong, LU Lu, SUN Meng, QIU Peiyun.
Analytical Study of SteadyState
Temperature Field of Local -Freezing and Water Sealing
in Foundation Pit Engineering
[J]. Tunnel Construction, 2024, 44(1): 116-125.
|
| [6] |
WU Cheng, ZHANG Bo, LEI Shasha, YANG Chuhan, LI Bin, LU Feng, ZHANG Junru.
Construction Risk Assessment of Shield Tunnel Crossing
Bridge Pile Foundation Group Based on FAHPGRA Method
[J]. Tunnel Construction, 2023, 43(S2): 186-196.
|
| [7] |
ZHANG Jianming, SHI Kebin, DALAYIHAN Bahetebieke, SHAN Hongze, SHI Renyi, FU Tao, LU Zhipeng.
Evaluation and Prediction of TBM′s
Geological Adaptability Based on VariableWeight Set PairMultidimensional Linked
Normal Cloud Model
[J]. Tunnel Construction, 2023, 43(4): 645-657.
|
| [8] |
XIAO Mingqing, SUN Wenhao, QU Liqing, LI Xiang, CHEN Libao, NI Jian, MA Xiangfeng.
Study on General Design of Second Jiaozhou Bay Subsea
Tunnel
[J]. Tunnel Construction, 2023, 43(2): 199-216.
|
| [9] |
GUO Hongbin, SONG Zhanping, MENG Chen, WANG Junbao, LIU Naifei, GUO Desai.
Shield Tunneling Risk Assessment Based on Nonlinear Fuzzy Analytic Hierarchy Method
[J]. Tunnel Construction, 2023, 43(11): 1862-1871.
|
| [10] |
GUO Fei, KONG Heng, SUN Kaiyue, TAO Lianjin, ZHANG Yu, MENG Yajuan.
Calculation Method of Carbon Emission in Metro Deep and
Large Foundation Pit Construction
[J]. Tunnel Construction, 2022, 42(S2): 197-206.
|
| [11] |
TAN Junkun, QIAO Shifan, CAI Ziyong, ZHAO Yong, ZHANG Xibao, XIANG Nan.
Stability Analysis of Underground Diaphragm Wall and
Karst Sidewall Based on Janssen Theory
[J]. Tunnel Construction, 2022, 42(S2): 225-233.
|
| [12] |
ZHAO Yan.
Stability Evaluation of Loess Tunnel during
Construction Based on Principal Component AnalysisCloud
Model
[J]. Tunnel Construction, 2022, 42(9): 1529-1536.
|
| [13] |
JIANG Zhenxiong, XUE Peng, MA Xin, XIE Jingchao, LIU Jiaping.
Evaluation System of Green Highway Tunnels
[J]. Tunnel Construction, 2022, 42(4): 586-593.
|
| [14] |
HONG Xiaochun.
Integrated Development Mechanism and Evaluation Method
of Underground Public Spaces and Rail Transit in Urban Central Areas under Carbon Peaking and Neutralization Policy
[J]. Tunnel Construction, 2022, 42(12): 2036-2047.
|
| [15] |
LI Pengfei, LI Kangning, ZHAO Xiaoyong, ZHAO Yong, LIU Jianyou.
Block Division Scheme for Prefabricated Secondary
Lining in Railway
Tunnel Based on Analytic Hierarchy Process
[J]. Tunnel Construction, 2021, 41(S2): 92-99.
|