| [1] |
LEI Mingfeng, LI Changwan, YANG Pengliang, JIA Chaojun, LI Chuitian.
Impact Zoning of Construction Disturbance on Nearby Existing Damaged BuildingsInduced by Foundation Pit of a Metro Station Based on Extended Finite Element Method and Response Surface Method
[J]. Tunnel Construction, 2026, 46(1): 69-79.
|
| [2] |
ZHANG Zhiguo, WAN Qimeng, LI Junjie, NI Yin, JIA Haoran, WEI Jian.
Impact of Deep Foundation Pit Excavation on Existing Metro Stations in Rheological Soft Strata and Reinforcement Effects: A Case Study of Shanghai Jinqiao Metro Over-Track Project
[J]. Tunnel Construction, 2025, 45(S2): 97-106.
|
| [3] |
LIU Xiaogang, SONG Yi, GUO Yanhai, YAO Xilei.
Design of Common Structure Section Between Jinan-Binzhou High-Speed Railway Tunnel and Airport
[J]. Tunnel Construction, 2025, 45(S2): 280-288.
|
| [4] |
WANG Gaoke, CHEN Jianwei, ZHOU Ronghui.
Design Optimization of Support Structures for Small-Sized Working Shaft Foundation Pits in Deep Soft Soil Regions
[J]. Tunnel Construction, 2025, 45(S2): 313-325.
|
| [5] |
LIN Huasheng, TANG Xinwei, NIE Ding, HUANG Wenmin, SONG Danqing.
Prediction of Deep and Large Shaft Deformation Based
on Multi-Output Machine Learning Model
[J]. Tunnel Construction, 2025, 45(S1): 113-124.
|
| [6] |
WANG Jian, CHEN Weitao, HUANG Peng, ZHANG Lixiang, YU Li, WANG Xue, LIU Yuan, LI Junqi, WANG Song.
Geometric Parameters of Spiral Highway Tunnels With
Large Slopes and Small Radius
[J]. Tunnel Construction, 2025, 45(S1): 193-207.
|
| [7] |
XIA Runhe, SHEN Qi, OUYANG Guowei, MA Chen, LI Yiming.
Green Ecological and Environmental Protection
Technologies and Management Practices During Construction Period
of Long Tunnels
[J]. Tunnel Construction, 2025, 45(S1): 249-259.
|
| [8] |
MA Yao, MEI Yuangui, DU Quan, WEI Kang, WAN Youcai.
Real-Train Tests on Pressure Comfort of Passenger Compartment of EMUs Under Frequent Air Pressure Variations in Multi-Tunnel Environments: Case Studies of Qinling Mountains Section of Xi′an-Chengdu High-Speed Railway and Baoji-Lanzhou High-Speed Railway
[J]. Tunnel Construction, 2025, 45(9): 1684-1697.
|
| [9] |
XU Youjun, JIN Chenyu, ZHANG Chao, WANG Nan.
Optimization of Counteracting Soil of Parameters a Deep Foundation Pit Close to an Existing Station in Hohhot, China
[J]. Tunnel Construction, 2025, 45(9): 1728-1741.
|
| [10] |
ZHANG Qian , LU Zhiwang, CUI Ding, ZHAO Wei, YE Youlin, SHANG Shijian.
Calculation of Ultimate Passive Support Pressure on Tunnel Face of Shield Tunnel Crossing Underneath Existing Pipeline in
Sandy Stratum
[J]. Tunnel Construction, 2025, 45(6): 1112-1119.
|
| [11] |
DENG Wenwu, HUANG Dawei, SONG Yi, ZHANG Zhiwei.
Differential Solution for
Longitudinal Deformation of Existing
Shield Tunnel Induced by Upper Excavation of a
Foundation Pit Considering Cross-Sectional Ovalization
[J]. Tunnel Construction, 2025, 45(6): 1120-1130.
|
| [12] |
WU Qiang, ZHAO Dongping, YANG Fan.
Application and Research of Landslide Parameter Inversion Results in Slope Evaluation of Tunnel Entrance
[J]. Tunnel Construction, 2024, 44(S2): 93-100.
|
| [13] |
RUAN Hengfeng, LIANG Rongzhu, KANG Cheng, LI Zhongchao, CAO Shi′an, DING Zhi.
Elaborate Numerical
Modeling of Metro Shield Tunnel Structure Deformation
Induced by Lateral Foundation Pit Excavation
[J]. Tunnel Construction, 2024, 44(S2): 245-255.
|
| [14] |
YU Weihe, HUANG Zhiqiang, WANG Naiyi, ZHANG Ning.
Application of Improved Pelican Optimization Algorithm-Convolutional Neural Networks-Bidirectional Gated Recurrent Unit Model in Predicting Foundation Pit Dewatering
[J]. Tunnel Construction, 2024, 44(S2): 286-299.
|
| [15] |
DU Quan, DU Yingchun, YANG Rui, WEI Kang, WAN Youcai, MEI Yuangui.
Full-Scale Test on Internal and External Pressure Wave Characteristics of High-Speed
Trains in Long, Steep Tunnels and Tunnel Group Environments
[J]. Tunnel Construction, 2024, 44(7): 1454-1464.
|