| [1] |
FENG Jimeng, LI Yifei, YAO Shiyu, WANG Shengtao, ZHANG Junru, SUN Ning.
Interactive Influence and Deformation Control of Construction Timing in Pile-Beam-Arch Method Metro Stations With Tunnel-Before-Station Sequence
[J]. Tunnel Construction, 2026, 46(1): 183-193.
|
| [2] |
CUI Shankun, SUN Sanxiang, ZHENG Xuting, LI Lei.
Impact of Leakage in Pressurized Ventilation Ducts on Diffusion of CO Concentration in Tunnels
[J]. Tunnel Construction, 2025, 45(S2): 249-257.
|
| [3] |
ZHENG Xuting, SUN Sanxiang, CUI Shankun.
Analysis and Application of Tunnel Construction
Ventilation Based on Generative Adversarial Networks
[J]. Tunnel Construction, 2025, 45(S1): 330-339.
|
| [4] |
LIU Jiguo, LIU Xialin, WEI Longhai, SONG Yujia.
Application of Horizontal Directional Drilling-Based Refined Tunnel Geological Investigation
[J]. Tunnel Construction, 2025, 45(9): 1719-1727.
|
| [5] |
TONG Yao, HAO Lei, LI Zhongzhi, CHEN Lei, GUO Yiguo, FU Yimu, SONG Changqing.
Fine Detection Method for Tunnel Unfavorable Geology Based on Love Surface Wave
[J]. Tunnel Construction, 2025, 45(8): 1549-1560.
|
| [6] |
GUO Weishe, XIE Tao, WANG Kai, LI Fengyuan, LI Shu′ao, BAO Peng, JIA Lianhui.
Progress of Researches on Intelligent Slurry Shield Driving Technologies
[J]. Tunnel Construction, 2025, 45(7): 1229-1248.
|
| [7] |
DENG Mingjiang, TAN Zhongsheng.
Methods for Evaluating Geological Adaptability of Open-Type TBM
[J]. Tunnel Construction, 2025, 45(6): 1043-1060.
|
| [8] |
JIANG Feng, HE Peng, WANG Gang, LI Weiteng, GAO Yongqing, ZHENG Chengcheng.
Development and Engineering
Application of a Safety Management and Intelligent
Decision-Making System for Entire Tunneling Process
[J]. Tunnel Construction, 2024, 44(S2): 266-285.
|
| [9] |
QUAN Yongwei, WANG Liming, ZHAO Hailei, LI Fengyuan.
Multi-Vehicle Dispatch Management Technology and System Development for Ultra-Long-Distance TBM Tunnels: A Case Study on a Water Supply Project in Northern
Xinjiang
[J]. Tunnel Construction, 2024, 44(S1): 105-112.
|
| [10] |
MENG Xiangpeng.
Construction Stability of Large-Section, Shallow-Buried Loess Tunnel by Micro-Bench Method
[J]. Tunnel Construction, 2024, 44(9): 1883-1894 .
|
| [11] |
XIAN Guo, ZOU Yongmu, LI Xiaobing, WANG Guan, WANG Yangyang.
Integrated Application and
Some Issues of Modern Tunneling Technology
for Chengdu-Kunming Railway Tunnel
[J]. Tunnel Construction, 2024, 44(8): 1713-1722.
|
| [12] |
LI Lei, SHAO Zhizhong, JIANG Hui, YAO Qifa.
Improvement and Application of Tunnel Seismic
Tomography and Complex Frequency Conductivity Technology in Advance
Geological Prediction
of
SegmentAssembled Tunnel
[J]. Tunnel Construction, 2023, 43(S2): 321-329.
|
| [13] |
YOU Jinhu, XIE Tao, LIU Yongsheng, PAN Yue, YIN Long.
Bearing Analysis of Tunnel Surrounding Rocks for
Tunnel Boring Machine Gripper and Treatments of Unfavorable Geology
[J]. Tunnel Construction, 2023, 43(S1): 473-479.
|
| [14] |
ZHANG Jiapeng, GUO Chun.
Optimization Model for Ventilation Control in Tunnel
Construction Based
on COAir Demand Theory
[J]. Tunnel Construction, 2023, 43(7): 1153-1160.
|
| [15] |
WU Dexing, LI Weiping, LI Changjun, CHI Fengxia, ZHENG Yunhui, LU Yuquan, QU Chengkun, ZHAN Wei, HUANG Ting, SUN Fei.
Review and Prospective of Scientific and Technological
Achievements of Highway Tunnels in Zhejiang Province, China
[J]. Tunnel Construction, 2022, 42(4): 519-531.
|