| [1] |
LYU Haimin, LIU Xiang, HAN Kaihang, CHEN Xiangsheng, DONG Zijun, ZHANG Jiaxuan.
Assessment Methods and Perspectives on Extreme Rainfall-Induced Flood Risks in Urban Underground Spaces
[J]. Tunnel Construction, 2025, 45(11): 1981-1993.
|
| [2] |
WANG Xuejian, ZHANG Yuyu, JIANG Sili, WANG Jiayuan.
Risk Management and Platform Implementation of Shield Tunneling in Metro Engineering Based on Digital Twin
[J]. Tunnel Construction, 2025, 45(11): 2100-2116.
|
| [3] |
WANG Jie, CHENG Guolong, ZHOU Bing, HU Wei, TAN Houjun, XIE Jianhong.
Safety Risk Evaluation of
Long-Distance Small-Diameter Tunnel Bored by Tunnel Boring
Machine
[J]. Tunnel Construction, 2024, 44(S2): 211-223.
|
| [4] |
LIU Chengwen, LIU Gang, XU Hua, DING Guopeng.
Mechanism and Risk
Assessment of Water and Mud Inrush in Water-Rich
Section With Tertiary Semi-Diagenetic
Sandstone and Mudstone in Wangjiazhai Tunnel
[J]. Tunnel Construction, 2024, 44(S1): 139-148.
|
| [5] |
QIN Yawei, TAN Yi, JU Wanglai, CHEN Bin.
Collapse Risk Assessment of Mountain Tunnels Based on
SetPair Analysis Theory and Digital Platform
[J]. Tunnel Construction, 2024, 44(3): 475-483.
|
| [6] |
PENG Shaoyong, FENG Shichun, XU Han.
Hazard Assessment Model for Water and Mud Inrush in Karst Tunnel Based on Interval Number Theory
[J]. Tunnel Construction, 2023, 43(S2): 100-106.
|
| [7] |
WU Cheng, ZHANG Bo, LEI Shasha, YANG Chuhan, LI Bin, LU Feng, ZHANG Junru.
Construction Risk Assessment of Shield Tunnel Crossing
Bridge Pile Foundation Group Based on FAHPGRA Method
[J]. Tunnel Construction, 2023, 43(S2): 186-196.
|
| [8] |
GUO Hongbin, SONG Zhanping, MENG Chen, WANG Junbao, LIU Naifei, GUO Desai.
Shield Tunneling Risk Assessment Based on Nonlinear Fuzzy Analytic Hierarchy Method
[J]. Tunnel Construction, 2023, 43(11): 1862-1871.
|
| [9] |
LEI Shengxiang, HUANG Mingli, TAN Zhongsheng.
Risk Characteristics and Classification of Urban Large
Underground Space Construction
[J]. Tunnel Construction, 2022, 42(10): 1663-1676.
|
| [10] |
XIA Runhe, QIAO Xiaoyan, WU Hongqun.
Causes and Prevention of Unsafe Behavior of Metro
Station Construction Workers
[J]. Tunnel Construction, 2021, 41(6): 1024-1031.
|
| [11] |
ZHANG Jichao, ZHOU Jianjun, SUN Feixiang, YANG Zhenxing, ZHANG Bing, YOU Huijie.
Risk Assessment on Underwater Docking Construction of
Shield Tunnel and
Mined Tunnel of Subsea Section on Xiamen Metro Line No. 3
[J]. Tunnel Construction, 2021, 41(2): 225-231.
|
| [12] |
TIAN Siming, WANG Wei, YANG Changyu, LIU Cheng, WANG Mingnian, WANG Kejin, MA Zhifu, LYU Gang.
Development and Prospect of Railway Tunnels in China
in Recent 40 Years
[J]. Tunnel Construction, 2021, 41(11): 1903-1930.
|
| [13] |
WANG Yesheng, HUANG Jianghua, WU Yong, PENG Shusheng, WU Wei.
Development of Risk Management and Control Platform
for Urban Rail Transit Facility Structure
[J]. Tunnel Construction, 2021, 41(1): 149-155.
|
| [14] |
WANG Shulei, GUAN Panfeng, DING Guosheng.
Risk Management in Early Stage of Connection Gallery
with Freezing Method: a Case Study on Freezing Project of Superlong
Connection
Gallery and Pump Station on Ziyang StationWuliting
Station of
Fuzhou
Rail Transit Line 2
[J]. Tunnel Construction, 2020, 40(S1): 258-265.
|
| [15] |
LU Yaobang, ZHUO Yue, SI Jingzhao, ZHANG Jianshe.
Research on BIM Construction Application in
Gaoligongshan Tunnel on
DaliRuili Railway
[J]. Tunnel Construction, 2020, 40(10): 1516-1524.
|