[1] |
XIAO Mingqing, XU Chen, XIE Biting, CHEN Wenpeng, WANG Kejin.
Research on Design Technology of Sequential Supporting for High-Speed Railway Tunnel Constructed by Drilling-and-Blasting Method
[J]. Tunnel Construction, 2023, 43(3): 369-382.
|
[2] |
JIA Lianhui, CHEN Shuai, JIA Zhengwen, JING Liujie, CHEN Qiang, NIU Kongxiao.
Research on Intelligent Construction Systems andKey Technologies for Drilling-and-Blasting Tunnels
[J]. Tunnel Construction, 2023, 43(3): 392-407.
|
[3] |
GUO Lei.
Three-Dimensional Automatic Design Method
for Tunnel Portal Engineering
[J]. Tunnel Construction, 2023, 43(3): 451-459.
|
[4] |
WANG Tongjun, MA Weibin, WANG Yong.
Key Technologies for Construction and Operation of Badaling Great Wall Underground Station on Beijing-Zhangjiakou HighSpeed Railway
[J]. Tunnel Construction, 2023, 43(1): 1-16.
|
[5] |
LI Lei, ZHU Chao, LIU Zhichun, AN Zhifei, LI Ning.
Construction Timing of Tunnel Secondary Lining in
Squeezing Rocks Based
on Statistics of Deformation Stabilization Time
[J]. Tunnel Construction, 2023, 43(1): 17-26.
|
[6] |
ENG Guoji, ZHANG Jiangshi, ZHANG Wenjuan, LUO Zhanfu, XU Qipeng.
Influence of Gaoligongshan Tunnel Environment on Workers
with Various Labor Intensities
[J]. Tunnel Construction, 2022, 42(S2): 124-131.
|
[7] |
CHEN Qiao, LI Zhijun, NIU Tongtong, ZHANG Hepei, ZHOU Yi, YU Jingbo.
Optimization of Tunnel Lining CrossSection
by Tunnel Boring Mahine Method in
Plateau Railway with Complex Geology
[J]. Tunnel Construction, 2022, 42(S2): 334-344.
|
[8] |
LI Zhijun, LIU Guangzhi, ZHOU Yi, LIU Weizheng, YU Jingbo, CHEN Qiao.
Application of Cantilever Roadheader Method in Loose
Accumulation of a Tunnel on Plateau Railway
[J]. Tunnel Construction, 2022, 42(S2): 363-371.
|
[9] |
YI Dingda, LI Zhijun, YU Jingbo, CHEN Qiao, LIU Guangzhi.
Application of Composed Consolidation Support
Technology in
Collapse Treatment of a Plateau Railway Tunnel
[J]. Tunnel Construction, 2022, 42(S2): 406-411.
|
[10] |
FANG Yuzhong, QI Rujian, YANG Haihang, LIU Sheng, LUO Xiangang, CHEN Zhen, HE Yatao.
Grouting Construction Technology for Prefabricated and
Assembled Arches of
Railway Tunnel Lining Constructed by Mining Method
[J]. Tunnel Construction, 2022, 42(S2): 421-427.
|
[11] |
WANG Tao, ZANG Jianbin, LI Peng.
A Review on Railway Tunnel Aerodynamics
[J]. Tunnel Construction, 2022, 42(S1): 7-18.
|
[12] |
ZHANG Zhigang, WU Ben, CHEN Jian, WU Chenglong, LIU Jiajun, LI Jinhui.
Effect of HeavyHaul Train on Bearing Capacity
of Cracked Tunnel Lining
[J]. Tunnel Construction, 2022, 42(S1): 56-65.
|
[13] |
TANG Jincai, CUI Youlong, TANG Junlin, WANG Gao.
Analysis of Large Deformation of Xiaoxiangling Tunnel
Based on Mechanical State Test of Surrounding Rock
[J]. Tunnel Construction, 2022, 42(S1): 238-248.
|
[14] |
LIU Kai, WU Zaixin, YANG Jizhong, OU Xiaoqiang, GUAN Haoyu.
Fatigue Life and AntiVibration
Measures of HighSpeed Railway Tunnel under Aircraft Landing Impact Load
[J]. Tunnel Construction, 2022, 42(S1): 281-288.
|
[15] |
WANG Rulei, WANG Zhijie, XU Haiyan.
Deformation Characteristics of Tunnel Face and
Corresponding Control Measures in FullyWeathered
Red Sandstone Stratum
[J]. Tunnel Construction, 2022, 42(S1): 301-311.
|