[1] |
WEI Gang, ZHAO Deqianlin, QI Yongjie.
Determination of Vertical Displacement of an Existing
Tunnel Caused by Underpass of QuasiRectangular Shield Tunnel
[J]. Tunnel Construction, 2022, 42(6): 960-966.
|
[2] |
GUAN Linxing, SUN Wei, ZHANG Mengxi, FANG Tao, ZHANG Guiyang.
Mechanical Performance and Experimental Research on Circumferential Fast Connector of Shield Tunnel
[J]. Tunnel Construction, 2022, 42(6): 967-974.
|
[3] |
DAI Hongbo, JI Yuguo.
Statistical Analysis of Chinese LargeDiameter
Shield Tunnel and StateofArt and
Prospective of Comprehensive Technologies
[J]. Tunnel Construction, 2022, 42(5): 757-783.
|
[4] |
ZHU Wei, LU Kaijun, XING Huitang, QIAN Yongjin, WANG Lu, WEI Bin.
Experimental Study of "Timecontrolling
Cement Mortar" in Backfill Grouting of Shield
Tunnel
[J]. Tunnel Construction, 2022, 42(5): 784-790.
|
[5] |
XIAO Mingqing, YU Xiongbing, XUE Guangqiao, ZHANG Chaoyong.
Waterproofing Mechanism of Double Seal Gaskets
Considering Breakdown Water Pressure
[J]. Tunnel Construction, 2022, 42(5): 791-797.
|
[6] |
WU Yankun, LI Xiaodong, CHEN Jian, SU Xiuting, MA Shuai.
Influence of Special Plasticizer for Shield Tunnel on Properties
of Synchronous Grouting Slurry
[J]. Tunnel Construction, 2022, 42(5): 798-806.
|
[7] |
ZHANG Hongsheng, SONG Weihao.
Automatic Evaluation Technology for Flat Deviation of Tunnel Pipe Ring End Face
[J]. Tunnel Construction, 2022, 42(5): 841-846.
|
[8] |
ZHU Yeting.
Model Test Verification of Synchronous Technology
Combining Shield Tunneling with Segment Assembling Based on Principle
of Uniform Loading on a Single Segment
[J]. Tunnel Construction, 2022, 42(5): 854-862.
|
[9] |
YAN Weiyao, DING Hongzhi, ZHOU Quan.
Stress Characteristic Analysis and Discussion of
Deformation Control Value of Underwater Shield Tunnel: a
Case Study of Jiajiang
Underwater
Shield Tunnel in Nanjing, China
[J]. Tunnel Construction, 2022, 42(5): 863-872.
|
[10] |
WANG Shimin, PENG Xiaoyu, CHEN Bing, WANG Xianming, RUAN Lei.
Surrounding Rock Stress Release Rate of Shield Tunnel
in UpperSoft and LowerHard Strata
[J]. Tunnel Construction, 2022, 42(4): 594-601.
|
[11] |
YANG Xiuren.
Design Technology and Method of OpenCut Prefabricated
Underground Structures of Urban Rail Transit
[J]. Tunnel Construction, 2022, 42(3): 355-362.
|
[12] |
XIE Yipeng, ZHANG Cong, YANG Junsheng, FU Jinyang, XIAO Chao, ZHAN Yongjie.
Research and Prospect on Technology for Resource Recycling of Shield Tunnel Spoil
[J]. Tunnel Construction, 2022, 42(2): 188-207.
|
[13] |
ZHOU Kaige, FANG Yong, LIAO Hang, WANG Kai, SONG Tiantian.
Effect of Soil Conditioner under Conditions of Shield
Mud Cake Blockage in Strongly Weathered
Mixed Granite Strata
[J]. Tunnel Construction, 2022, 42(2): 283-290.
|
[14] |
LIU Heng, SUN Xiaohui, MU Song, ZHOU Xuebin, LI Heng, CHEN Xiangsheng.
Treatment Process and a Complete Set of Equipment for
Resource Utilization of Waste Soil in Shield Tunneling
[J]. Tunnel Construction, 2022, 42(2): 320-327.
|
[15] |
ZHU Wei, QIAN Yongjin, WANG Lu, WEI Bin, LU Kaijun, FANG Zhongqiang, MENG Lifu.
Classification, Treatment, and Utilization Techniques
of Shield Tunnel Abandoned Soil and Related Issues
[J]. Tunnel Construction, 2021, 41(S2): 1-13.
|