[1] |
LI Zhijun, LIU Guangzhi, YU Jingbo, CHEN Qiao.
Key Techniques of Excavation and Blasting in ShallowBuried
Soft and Hard Strata
of Tunnel Boring Machine Preparatory Tunnel of Plateau Railway
[J]. Tunnel Construction, 2022, 42(6): 1044-1052.
|
[2] |
LI Zhijun, CHEN Kui, CHEN Qiao, ZHOU Yi, LI Zeng, YU Jingbo, ZHANG Xiao.
Discussion on Open TBM Excavation Diameter of a
Plateau Railway Tunnel
[J]. Tunnel Construction, 2022, 42(5): 807-816.
|
[3] |
LIN Chungang.
Innovative Key Technologies and Complete Sets of
Equipment for Informatized Construction
of Railway Tunnel Lining for Quality Improvement
[J]. Tunnel Construction, 2022, 42(4): 554-569.
|
[4] |
CHEN Shanmin, WANG Quansheng, XIN Weike, JIA Dapeng.
Control Technology of Soft Rock Large Deformation in
New Wushaoling Tunnel Induced by Cantilever Excavator Construction
[J]. Tunnel Construction, 2022, 42(4): 720-729.
|
[5] |
LIU Yumeng, ZHANG Junru, HE Guannan, YAN Bo, WANG Zhiyong.
Stability Analysis and Support Optimization of
Surrounding Rock of HighSpeed Railway Tunnel FullFace Mechanical
Operation
Based on Strength Reduction Method
[J]. Tunnel Construction, 2022, 42(3): 451-462.
|
[6] |
JIA Jianbo, YAO Hui , ZHOU Zhihui.
Application of Modified Urea Formaldehyde Resin in
Water Sealing Grouting of Shaft #1 of Gaoligongshan Tunnel
[J]. Tunnel Construction, 2022, 42(3): 487-491.
|
[7] |
LI Jing, JIANG Zhaohan.
Design and Application of Jacking Structure for
Precast Segment of Arch of Tunnel Secondary Lining
[J]. Tunnel Construction, 2022, 42(3): 501-507.
|
[8] |
WANG Hua, SUN Yi, LI Yongzhi, PAN Yue, PENG Guibin.
Regional Geological Analysis of Xinping Tunnel of YuxiMohan Railway Evaluation System of Tunnel Site
[J]. Tunnel Construction, 2021, 41(S2): 58-67.
|
[9] |
LI Pengfei, LI Kangning, ZHAO Xiaoyong, ZHAO Yong, LIU Jianyou.
Block Division Scheme for Prefabricated Secondary
Lining in Railway
Tunnel Based on Analytic Hierarchy Process
[J]. Tunnel Construction, 2021, 41(S2): 92-99.
|
[10] |
WU Yuanjin.
Technical Improvement and Application of Gallery
Ventilation in Xiangluping Tunnel Construction
[J]. Tunnel Construction, 2021, 41(S2): 542-550.
|
[11] |
LONG Bin, LIU Zhihua, XIAO Jing.
Adaptive Design of Tunnel Boring Machine Used in SichuanTibet
Railway Tunnel
under Complex and Severe Conditions
[J]. Tunnel Construction, 2021, 41(S2): 626-633.
|
[12] |
QING Weichen, ZHONG Changgui, ZENG Hongfei.
Discussion on Inverted Arch and Its Filling by
Separate Pouring or Integral Pouring in Railway
Tunnel
[J]. Tunnel Construction, 2021, 41(S1): 63-.
|
[13] |
LIU Jia.
Pressure Calculation Method and Stress Characteristics
of Surrounding Rock
of SmallSpacing Tunnel in Weak Stratum
[J]. Tunnel Construction, 2021, 41(S1): 174-.
|
[14] |
WANG Yanjie, LI Cangsong, SHI Yongyue, ZHANG Tao, WANG Bin.
Adaptability Analysis of TBM in Main Unfavorable
Geological of Sichuan-Tibet Railway Tunnel and Its Key
Construction Technologies
[J]. Tunnel Construction, 2021, 41(S1): 470-.
|
[15] |
MEI Zhu.
Optimization of Composite Lining Structure of a SingleTrack HeavyHaul Railway Tunnel
[J]. Tunnel Construction, 2021, 41(9): 1547-1554.
|