[1] |
LI Dawei.
Failure Analysis and
Solutions for Rotating Body of Shield Tunnel
Segment Assembly Machine
[J]. Tunnel Construction, 2024, 44(S2): 462-469.
|
[2] |
ZHUANG Qianwei, ZHU Yanfei, YU Ning, HUANG Dezhong, YANG Zheng, MA Zhigang, YUAN Weihao.
Experimental Study of
Automatic Segment Grasping Based on Depth-Image Pose Recognition and Kinematic Mechanisms
[J]. Tunnel Construction, 2024, 44(11): 2133-2138.
|
[3] |
HU Yanwei, JIA Lianhui, LI Ming.
Development and Application of Segment Erector for Horseshoe-Shaped
Shield Tunnel
[J]. Tunnel Construction, 2023, 43(2): 327-333.
|
[4] |
LI Jie, ZHANG Xin, MA Chao, YANG Long, GUO Jingbo.
Analysis and Experimental Research on Synchronous
Performance of Segment Erector Lifting System
[J]. Tunnel Construction, 2020, 40(7): 1072-1080.
|
[5] |
XIE Zhong.
Operation Principle, Malfunction Diagnosis and Malfunction Prevention of
Segment Erectors of Shield Machines
[J]. Tunnel Construction, 2010, 30(4): 486-491.
|
[6] |
LI Guang, DIAO Xiao-Dong.
Design of a New Rotary Limit Device for Segment Erectors
[J]. Tunnel Construction, 2010, 30(1): 97-99,109.
|
[7] |
ZHONG Youxin, GUO Defu, LUO Caoyuan.
Case Study on Design and Construction Technology for Track
Haulage Hoist System of Huge Inclined Shaft
[J]. Tunnel Construction, 2008, 28(1): 70-73.
|