| [1] |
AI Wenkai.
Large Deformation Characteristics of Layered Rock Masses and Deformation Control of Asymmetric Support in High-Speed Railway Tunnels
[J]. Tunnel Construction, 2026, 46(2): 371-382.
|
| [2] |
GAO Hongjie, XING Peigang, MA Weibin, ZHAO Jianjun, ZOU Wenhao, ZHANG Jinlong, HUANG Xinyu, XU Haotian.
Active-Passive Combined Large Deformation
Control Technology of Strong
Extrusion Fractured Soft Rock Tunnel
[J]. Tunnel Construction, 2025, 45(S1): 290-307.
|
| [3] |
XU Qingfeng, JI Xiaomeng, YING Hongwei, ZHANG Xiaoshuai, ZHU Chengwei, ZHOU Qiupei.
Smoothed Particle Hydrodynamics Modeling of Large Deformations in Tunnel Face Instability
[J]. Tunnel Construction, 2025, 45(8): 1494-1504.
|
| [4] |
WEN Jiaxin, LI Huajian, SHI Henan, LI Liangshun, DONG Haoliang.
Mechanical Constitutive Model and Energy Absorption Performance of High-Energy-Absorbing Concrete Based on Computed Tomography Scanning
[J]. Tunnel Construction, 2025, 45(11): 2063-2075.
|
| [5] |
GUO Limin, LI Guoliang, QI Zhanfeng, LI Fangfang, ZHANG Jing.
Discussion on Identification and Classification Standards of High Geostress
[J]. Tunnel Construction, 2025, 45(10): 1919-1925.
|
| [6] |
TAO Zhigang, LIN Weijun, LI Yong, SUN Yingying, XIONG Yiwen, CHEN Mingliang.
Control Technology of
Negative Poisson′s Ratio Anchor Cable for Large Deformation Tunnel Across Faulted Soft Rocks
[J]. Tunnel Construction, 2024, 44(S1): 113-123.
|
| [7] |
JIN Yafeng, ZHOU Jiebin, ZHOU Weijin.
Mechanism Analysis and
Control Technology of Large Deformation in Extremely-Fractured Soft Rock Tunnels in Western Sichuan, China: A Case Study of Chazhenliangzi Tunnel
[J]. Tunnel Construction, 2024, 44(S1): 344-354.
|
| [8] |
WANG Qingli.
Design and Engineering
Practice of C-Shaped Connecting Gallery for
Frozen Excavation Method in Rich Water Sand Layer
[J]. Tunnel Construction, 2024, 44(S1): 387-395.
|
| [9] |
TAO Zhigang, SUN Jihao, CAO Zhensheng, HU Cai, GUO Longji, HE Manchao.
Mechanism of Double-Gradient Grouting for Large Deformation Control of Surrounding Rock in Tunnels Crossing Fault Fracture
Zones
[J]. Tunnel Construction, 2024, 44(6): 1194-1213.
|
| [10] |
ZHAO Lipeng, LI Jian, LEI Xiaotian, GUO Yaxin, WANG Tingchao, TAO Zhigang.
L-Shaped Ground Advance Grouting Scheme in Bad Geological Section of Xianglushan Tunnel
[J]. Tunnel Construction, 2024, 44(6): 1294-1304.
|
| [11] |
QIAO Minglei, LI Sheng, ZHANG Jiangong, WANG Qicai, XUE Yanjin, CHEN Zhigang.
FiveStep Single SideDrift Method for Fenghuangshan SuperLarge CrossSection Loess Tunnel
[J]. Tunnel Construction, 2024, 44(5): 1096-1105.
|
| [12] |
WANG Bin, YANG Yandong, ZHOU Jianjun, LI Fengyuan, XU Haifeng, LIU Chaoyin.
Surrounding Rock Deformation Control Technology for
Tunnels Constructed Using Open Tunnel Boring Machines in Soft Rock Strata
With High Geostress:
A
Case Study of Xianglushan Tunnel
[J]. Tunnel Construction, 2024, 44(2): 341-348.
|
| [13] |
XIAO Mingqing, XU Chen, XIE Biting, DENG Zhaohui, WANG Kejin.
Research on "Strength-Deformation-Timing" Integrated Design Method for Tunnel Support Based on Total Safety Factor Method
[J]. Tunnel Construction, 2024, 44(12): 2480-2499.
|
| [14] |
LI Guofeng, LI Zhihou.
Achievements and Prospects of Yunnan Highway Tunnel
Construction
[J]. Tunnel Construction, 2023, 43(S2): 10-26.
|
| [15] |
XU Chongbang, ZHENG Ziteng, XIN Hongsheng, MIU Yuanbing, DU Ju.
Classification and Prospect for Large Deformation of
Tunnel Surrounding Rock
[J]. Tunnel Construction, 2023, 43(S2): 27-40.
|