| [1] |
ZHANG Tian, FU Bingxian, GAO Yaming, NIU Yabin, ZHANG Lixia.
Prefabricated Composite Lining Structure for Reinforcing Railway Tunnel Linings and Its Construction Technology
[J]. Tunnel Construction, 2026, 46(5): 1121-1132.
|
| [2] |
TIAN Siming, ZHANG Yiteng, LI Shucai, LIU Dagang, LI Xu.
Construction and Intelligent Design of a High-Performance Active Support System for Railway Tunnels
[J]. Tunnel Construction, 2026, 46(4): 790-803.
|
| [3] |
ZHAO Xiaoyong, LI Guoliang, WANG Xindong, GAO Xinqiang, XIONG Wei, GUO Xiansuo.
Mechanical Properties of Prefabricated Inverted Arch Structures in Railway Tunnels During Construction
[J]. Tunnel Construction, 2026, 46(4): 828-839.
|
| [4] |
ZHAO Yong, TIAN Siming, GONG Jiangfeng, CAO Yong.
Statistical Analysis of Railway Tunnels in China by the End of 2025 and Achievements in the 14th Five-Year Plan Period
[J]. Tunnel Construction, 2026, 46(4): 877-892.
|
| [5] |
QI Wencong.
Regional Analysis of Disc Cutter Consumption and Failure of a TBM Conical Cutterhead in Spiral Ramp of Beishan Underground Laboratory
[J]. Tunnel Construction, 2026, 46(2): 322-335.
|
| [6] |
LI Wenqing, LIU Yongsheng, HONG Kairong, KOU Lei, TAN Zhongsheng, XU Weiqing, MA Shiju, ZHU Yongchao, YU Jingbo.
Mapping Relationships Between TBM Tunneling Parameters and Surrounding Rock Grades
[J]. Tunnel Construction, 2026, 46(2): 336-347.
|
| [7] |
GONG Qiuming, HUANG Liu, LIU Yongqiang, XIE Xingfei, HAO Gang, ZHANG Fang.
Development of a Rock Mass Information System for TBM Tunneling Faces
[J]. Tunnel Construction, 2026, 46(2): 348-358.
|
| [8] |
AI Wenkai.
Large Deformation Characteristics of Layered Rock Masses and Deformation Control of Asymmetric Support in High-Speed Railway Tunnels
[J]. Tunnel Construction, 2026, 46(2): 371-382.
|
| [9] |
PAN Yue, XIE Tao, LIU Yongsheng, GAO Pan, YANG Zhenxing.
Intelligent Identification and Prevention of TBM Jamming in Hard-Rock Fractured Zones
[J]. Tunnel Construction, 2026, 46(2): 383-393.
|
| [10] |
HU Junwei.
Composite Rock Fragmentation Technology Using Blasting Presplitting and Disc Cutters for Highly Intact and Extremely Hard Rock
[J]. Tunnel Construction, 2026, 46(2): 394-405.
|
| [11] |
WU Fan, QI Mengxue, LEI Shengxiang, HUANG Jiangfan, SONG Hongjiao, ZHANG Yuntong, HU Junwei, LI Jucai.
Mucking for TBM Tunneling Using Continuous-Belt Conveyor Technology in Large-Slope Variable-Grade Spiral Tunnels
[J]. Tunnel Construction, 2026, 46(2): 419-429.
|
| [12] |
BAI Qian, LI Zheng, ZHAO Wen, PENG Zhipeng.
Impact of Small Pipe-Roof-Top Slab Method Support Parameters in Metro Stations on Surface Settlement
[J]. Tunnel Construction, 2026, 46(1): 103-112.
|
| [13] |
LI Xu, YU Hongwei, LIU Jianguo, YE Ming, REN Changchun, WU Gensheng, DONG Zikai.
A Rapid Sensing Method for Rock Mass Quality in TBM Tunnel Construction Based on Adaptive Particle Swarm Optimization-Probability Calibration-Extreme Gradient Boosting Model
[J]. Tunnel Construction, 2026, 46(1): 134-144.
|
| [14] |
WANG Shuaishuai, QIU Wenge, SHI Jingfeng, XU Yong, SUN Xiangdong, WANG Yongshi, CHEN Haozhe, DUAN Dongya.
Shrinkage Restraint Cracking Mechanism and Anticracking Optimization Measures for Lining of High-Altitude Tunnels
[J]. Tunnel Construction, 2026, 46(1): 168-182.
|
| [15] |
SONG Xiaokai.
Application of Continuous Circumferential Milling-Type Chiseling Trolley for Operating Railway Tunnel Lining
[J]. Tunnel Construction, 2026, 46(1): 204-213.
|