[1] |
ZHAO Wenxiang, QU Bingyu, WANG Houlin, HUANG Liangliang.
Application of Building Information Modeling Technology in Optimization of Embedded Channels in Shield Tunnel Segments
[J]. Tunnel Construction, 2025, 45(2): 375-381.
|
[2] |
YAN Chao, YANG Ping, LI Zhixi, ZHANG Ting.
Freezing Rehabilitation Technology for Severe Segment Dislocation in Connecting Passages by Mechanized Methods
[J]. Tunnel Construction, 2025, 45(2): 392-401.
|
[3] |
HU Min, ZHAO Pengpeng, WU Bingjian.
Optimization of Key
Assembly Points of Universal Segment of a Shield
Tunnel Under Complex Construction Conditions
[J]. Tunnel Construction, 2025, 45(1): 77-84.
|
[4] |
WANG Haitao, WANG Yue, SUN Jiuchun.
Development of A Segment
Uplift Model Test System
[J]. Tunnel Construction, 2025, 45(1): 132-138.
|
[5] |
WANG Zheyong, LIU Chenglong, XU Zhen, XIAO Yongqiang, ZONG Chao, SUN Yingtao, JIANG Yusheng.
Displacement and
Deformation Mode of Complex Rock Strata in Central Urban Area Induced by Double-Shield Tunnel
Boring Machine
[J]. Tunnel Construction, 2024, 44(S2): 135-143.
|
[6] |
RUAN Hengfeng, LIANG Rongzhu, KANG Cheng, LI Zhongchao, CAO Shi′an, DING Zhi.
Elaborate Numerical
Modeling of Metro Shield Tunnel Structure Deformation
Induced by Lateral Foundation Pit Excavation
[J]. Tunnel Construction, 2024, 44(S2): 245-255.
|
[7] |
QI Chun, YU Yu, PANG Tao, LIU Jinsong, TIAN Siming, WANG Chuang, LUO Lusen.
General Design Scheme For
Shu′an Tunnel of Chengdu-Chongqing Midline Railway
[J]. Tunnel Construction, 2024, 44(S2): 391-398.
|
[8] |
LI Dawei.
Failure Analysis and
Solutions for Rotating Body of Shield Tunnel
Segment Assembly Machine
[J]. Tunnel Construction, 2024, 44(S2): 462-469.
|
[9] |
WANG Gui, YI Binbin, LI Fudong, ZHONG Xiaochun, JIAN Yongzhou, ZHU Cheng, WU Ronghua.
Synchronous Two-component Grout Development and Backfill Grouting Effect of EPB Shield
[J]. Tunnel Construction, 2024, 44(S1): 257-264.
|
[10] |
ZHANG Chengping, WANG Libin, TANG Haidong, PENG Hua, LI Yujie, NIU Xiaokai.
Study on Causes of Leakage
in Beijing Metro Shield Tunnel and Its Influence
on Segment Structure
[J]. Tunnel Construction, 2024, 44(S1): 456-466.
|
[11] |
ZHANG Wenjun, ZHOU Xinnan, ZHANG Gaole, HE Weiguo, YU Yong.
Experimental Study on Waterproof Performance of Double-Sealing Gaskets at Segmental Joints of Shield Tunnels
[J]. Tunnel Construction, 2024, 44(9): 1744-1751.
|
[12] |
DU Chuangdong, DU Yihang, HUANG Xiaofu.
Control Technology for
Segment Dislocation and Attitude
of Large-Diameter Shield Tunnels
[J]. Tunnel Construction, 2024, 44(7): 1510-1519.
|
[13] |
QIAN Qihu, HU Xiaoqiang, LI Shuchen, CHEN Jian, ZHU Weibin.
Recent Advances in Key Technologies of Shield Tunnel Engineering in China
[J]. Tunnel Construction, 2024, 44(5): 897-926.
|
[14] |
LI Linfeng, TAN Zhongsheng, ZHOU Zhenliang, PENG Wenbo.
Support Effect of Steel Tubes of Open Tunnel Boring
Machine in Tianshan Shengli Tunnel
[J]. Tunnel Construction, 2024, 44(5): 984-990.
|
[15] |
BAO Xiaohua, LI Junhong, CHEN Xiangsheng, SHEN Jun, LIU Ziming, YAO Yi.
Research Status and Prospects of Quality Control
Methods for Segment Assembly in Underwater Shield Tunnels
[J]. Tunnel Construction, 2024, 44(4): 643-662.
|