| [1] |
WANG Shuangwang, YANG Bin, ZHONG Qingfeng, CHEN Liangwu.
Intelligent Fault Diagnosis of Low-Speed, Heavy-Load, Ultra-Large Rolling Bearings Using a Channel Attention Mechanism and a One-Dimensional Convolutional Neural Network
[J]. Tunnel Construction, 2026, 46(5): 985-993.
|
| [2] |
QI Wencong.
Regional Analysis of Disc Cutter Consumption and Failure of a TBM Conical Cutterhead in Spiral Ramp of Beishan Underground Laboratory
[J]. Tunnel Construction, 2026, 46(2): 322-335.
|
| [3] |
LI Wenqing, LIU Yongsheng, HONG Kairong, KOU Lei, TAN Zhongsheng, XU Weiqing, MA Shiju, ZHU Yongchao, YU Jingbo.
Mapping Relationships Between TBM Tunneling Parameters and Surrounding Rock Grades
[J]. Tunnel Construction, 2026, 46(2): 336-347.
|
| [4] |
GONG Qiuming, HUANG Liu, LIU Yongqiang, XIE Xingfei, HAO Gang, ZHANG Fang.
Development of a Rock Mass Information System for TBM Tunneling Faces
[J]. Tunnel Construction, 2026, 46(2): 348-358.
|
| [5] |
PAN Yue, XIE Tao, LIU Yongsheng, GAO Pan, YANG Zhenxing.
Intelligent Identification and Prevention of TBM Jamming in Hard-Rock Fractured Zones
[J]. Tunnel Construction, 2026, 46(2): 383-393.
|
| [6] |
HU Junwei.
Composite Rock Fragmentation Technology Using Blasting Presplitting and Disc Cutters for Highly Intact and Extremely Hard Rock
[J]. Tunnel Construction, 2026, 46(2): 394-405.
|
| [7] |
WU Fan, QI Mengxue, LEI Shengxiang, HUANG Jiangfan, SONG Hongjiao, ZHANG Yuntong, HU Junwei, LI Jucai.
Mucking for TBM Tunneling Using Continuous-Belt Conveyor Technology in Large-Slope Variable-Grade Spiral Tunnels
[J]. Tunnel Construction, 2026, 46(2): 419-429.
|
| [8] |
LI Xu, YU Hongwei, LIU Jianguo, YE Ming, REN Changchun, WU Gensheng, DONG Zikai.
A Rapid Sensing Method for Rock Mass Quality in TBM Tunnel Construction Based on Adaptive Particle Swarm Optimization-Probability Calibration-Extreme Gradient Boosting Model
[J]. Tunnel Construction, 2026, 46(1): 134-144.
|
| [9] |
MAO Qingsong, HE Fei, JIA Lianhui, NING Xiangke, ZHANG Xiao, LIN Laikuang.
Simulation of Oxygen Concentration Distribution in High-Altitude TBM Construction Tunnels Based on Computational Fluid Dynamics
[J]. Tunnel Construction, 2025, 45(S2): 193-203.
|
| [10] |
SUN Yi, YU Hongwei, YE Ming, WU Gensheng, REN Changchun, DU Zhanjun, ZHANG Yunpei, LI Xu, LI Jian.
Intelligent Recognition Methods for Muck Flow Status in Inclined Shaft TBM
[J]. Tunnel Construction, 2025, 45(S2): 214-221.
|
| [11] |
JIANG Hongyue, WANG Fan, WANG Zhihua, ZHAI Shiji.
Online Prediction of Shield Attitude for Long-Distance Tunneling
[J]. Tunnel Construction, 2025, 45(S2): 236-248.
|
| [12] |
ZHU Ying, LI Jianbin, CAO Chenxu, NIAN Junjie, YOU Weixing.
Novel Cutterhead Design for Cantilever TBMs
[J]. Tunnel Construction, 2025, 45(S2): 365-370.
|
| [13] |
ZHOU Shuliang, WEI Xiaolong, XIE Hongwu, FENG Shuo, LIN Fulong, HUANG Zhen, JIAO Jingbo.
Muck Volume Measurement System Based on Irregular
Triangular Prism Model
[J]. Tunnel Construction, 2025, 45(S1): 88-95.
|
| [14] |
LONG Haitao, ZHANG Shishu, MA Chunchi, LI Tianbin, LIU Zhuangyuan, LIU Yang.
Precise Dual-Mode Classification of
Surrounding Rocks of Tunnels Bored by Double-Shield TBM Based on High Resolution Neural Networks
[J]. Tunnel Construction, 2025, 45(S1): 168-181.
|
| [15] |
LI Jianxin, ZHANG Jixun, MA Jia, REN Xuhua, ZHANG Yuxian, DENG Zi′ang.
Optimizing Initial Geostress Field Inversion Using Least Absolute Shrinkage and Selection Operator-Ordinary Least Squares Method
[J]. Tunnel Construction, 2025, 45(9): 1698-1710.
|