| [1] |
JIANG Hua, WANG Zixiao, GUO Yongjian, GAN Congyu, LIU Hongzhi, SUN Shuliang.
Intelligent Monitoring of Rock Slag Volume in Slurry Shield Screening Based on Binocular-Vision Point Cloud
[J]. Tunnel Construction, 2026, 46(S1): 196-204.
|
| [2] |
TAO Zanxu, WANG Jian, WU Xianguo, LI Shifan, HUANG Fengjin, LI Wenjian.
Hybrid Optimization Framework for Large-Diameter Slurry Balance Shield Tunneling Safety and Stability
[J]. Tunnel Construction, 2026, 46(8): 1628-1639.
|
| [3] |
ZHANG Zipeng, JIA Jingqi, CHEN Yun, MA Guowei.
Calculation Method for External Water Pressure Acting on Tunnels in Strata Containing Karst Conduits
[J]. Tunnel Construction, 2026, 46(8): 1693-1702.
|
| [4] |
HAN Jialin, LIU Xue, WANG Xianjun, XIE Zheng.
Global Typical Case Statistics and Development Analysis of Full-Face Tunnel Boring Machines
[J]. Tunnel Construction, 2026, 46(6): 1359-1382.
|
| [5] |
WANG Shuangwang, YANG Bin, ZHONG Qingfeng, CHEN Liangwu.
Intelligent Fault Diagnosis of Low-Speed, Heavy-Load, Ultra-Large Rolling Bearings Using a Channel Attention Mechanism and a One-Dimensional Convolutional Neural Network
[J]. Tunnel Construction, 2026, 46(5): 985-993.
|
| [6] |
LIU Sijin, TAN Shuai, WANG Huawei, LIU Songyu, ZHU Xuehao, LIAN Xin.
Data-Driven Multi-Objective Optimization Decision-Making for Large-Diameter Slurry Shield Tunneling Performance
[J]. Tunnel Construction, 2026, 46(4): 704-718.
|
| [7] |
REN Guoping, ZHANG Jian, FENG Tugen, YU Xuejuan, ZHANG Wenchao, FANG Yuan.
A Dual-Path Prevention and Control Method for Mud Cakes on Shield Cutterhead in Highly Viscous Formations Based on Dispersant Treatment
[J]. Tunnel Construction, 2026, 46(3): 562-575.
|
| [8] |
WU Zhongjun, WU Silin, LIU Lei, DONG Shutong, ZHENG Qi.
Synergistic Dewatering-Cementation Technique for Producing Flowable Fill From Shield Waste Slurry
[J]. Tunnel Construction, 2026, 46(3): 609-619.
|
| [9] |
YANG Yi, ZHANG Zhihao, LI Xinggao, WANG Qingjie, GUO Yidong, ZHENG Shuai.
Optimization of Mud Retention in Short-Screw Conveyor of Slurry Shield Based on Computational Fluid Dynamics-Discrete Element Method Simulation
[J]. Tunnel Construction, 2026, 46(3): 631-646.
|
| [10] |
JIANG Hongyue, WANG Fan, WANG Zhihua, ZHAI Shiji.
Online Prediction of Shield Attitude for Long-Distance Tunneling
[J]. Tunnel Construction, 2025, 45(S2): 236-248.
|
| [11] |
ZHOU Shuliang, WEI Xiaolong, XIE Hongwu, FENG Shuo, LIN Fulong, HUANG Zhen, JIAO Jingbo.
Muck Volume Measurement System Based on Irregular
Triangular Prism Model
[J]. Tunnel Construction, 2025, 45(S1): 88-95.
|
| [12] |
LI Jianxin, ZHANG Jixun, MA Jia, REN Xuhua, ZHANG Yuxian, DENG Zi′ang.
Optimizing Initial Geostress Field Inversion Using Least Absolute Shrinkage and Selection Operator-Ordinary Least Squares Method
[J]. Tunnel Construction, 2025, 45(9): 1698-1710.
|
| [13] |
GUO Weishe, XIE Tao, WANG Kai, LI Fengyuan, LI Shu′ao, BAO Peng, JIA Lianhui.
Progress of Researches on Intelligent Slurry Shield Driving Technologies
[J]. Tunnel Construction, 2025, 45(7): 1229-1248.
|
| [14] |
FU Baiyong, SONG Shenyou, JIN Wenliang.
Vibrodensification Test and Particle Flow Simulation of Rock Cushion in Immersed Tunnels
[J]. Tunnel Construction, 2025, 45(6): 1090-1101.
|
| [15] |
.
Interaction Load Between Rock and Super-Large
Diameter Slurry Shield Based on Data-Driven Method
[J]. Tunnel Construction, 2025, 45(4): 677-686.
|