[1] |
CHEN Ke, LIU Tianrui, YANG Zhao.
Current Status and Future
Prospects of Shield Tunneling Attitude
Control Technology
[J]. Tunnel Construction, 2024, 44(6): 1154-1164.
|
[2] |
YI Guoliang.
Discussion on Technological Development and Key
Management Points of Shield Tunneling
[J]. Tunnel Construction, 2024, 44(5): 927-942.
|
[3] |
ZHAO Deqianlin, WEI Gang, LIANG Luju, JIANG Haibo, XIANG Pengfei, MU Zhiyuan.
Experimental Study on Responses of Existing Tunnels to
Adjacent QuasiRectangular Shield Tunneling
in Sandy Soil
[J]. Tunnel Construction, 2024, 44(5): 1000-1011.
|
[4] |
HU Changming, FENG Lili, LI Liang, YU Xiangtao, LI Zengliang.
Surface Settlement Control and Parameter Optimization
of Shield Tunneling Based on Machine Learning
[J]. Tunnel Construction, 2023, 43(12): 1985-1995.
|
[5] |
GUO Hongbin, SONG Zhanping, MENG Chen, WANG Junbao, LIU Naifei, GUO Desai.
Shield Tunneling Risk Assessment Based on Nonlinear Fuzzy Analytic Hierarchy Method
[J]. Tunnel Construction, 2023, 43(11): 1862-1871.
|
[6] |
WANG Fuli, WANG Jianxin, ZHU Guoli.
LidarBased Dynamic Measuring System for
Earth Pressure Balance Shield Mucking
[J]. Tunnel Construction, 2022, 42(S2): 494-501.
|
[7] |
ZHU Yeting.
Model Test Verification of Synchronous Technology
Combining Shield Tunneling with Segment Assembling Based on Principle
of Uniform Loading on a Single Segment
[J]. Tunnel Construction, 2022, 42(5): 854-862.
|
[8] |
XIE Yipeng, ZHANG Cong, YANG Junsheng, FU Jinyang, XIAO Chao, ZHAN Yongjie.
Research and Prospect on Technology for Resource Recycling of Shield Tunnel Spoil
[J]. Tunnel Construction, 2022, 42(2): 188-207.
|
[9] |
LIU Heng, SUN Xiaohui, MU Song, ZHOU Xuebin, LI Heng, CHEN Xiangsheng.
Treatment Process and a Complete Set of Equipment for
Resource Utilization of Waste Soil in Shield Tunneling
[J]. Tunnel Construction, 2022, 42(2): 320-327.
|
[10] |
HUANG Jihui, TANG Zhicheng, ZHANG Xiaohui, CHEN Xiaoyang, GUO Xiao.
Stratigraphic Correlation of EFPI and Evolution
Regularity of Shield Tunneling Parameter In Complex Stratum
[J]. Tunnel Construction, 2021, 41(S2): 215-221.
|
[11] |
BAI Xiangrui, RONG Xiaoli, WEN Zhu, ZHANG Ning.
Prediction of Surface Settlement in Construction Stage
of Earth Pressure Balance Shield Tunnel Based on
Differential Evolution AlgorithmSupport Vector Regression Machine
[J]. Tunnel Construction, 2021, 41(S2): 336-345.
|
[12] |
LIU Zhitao, WANG Lichuan, JIANG Kuisong, LEI Mingfeng, LIU Xupeng, LIU Yahui, ZHAO Chenyang.
Construction Settlement Control of Shield Tunnel Crossing
underneath Hefei Railway Station Based on Exposed Length Optimization〖
[J]. Tunnel Construction, 2021, 41(S2): 565-573.
|
[13] |
ZHANG Long, HUANG Mingli, ZHANG Enyuan.
Relationship Between Properties of TwoComponent
Grout and Construction Schedule of Shield Tunnel in
Waterrich Sandy Stratum
[J]. Tunnel Construction, 2021, 41(S1): 407-.
|
[14] |
GUO Zhi, TANG Xigang, HAN Lisen, TIAN Bin, DING Shaojun, LU Xiaofeng.
Study and Practice on Negative Ring Launching
Technique for
DoubleShield TBM Used in Qingdao Metro
[J]. Tunnel Construction, 2021, 41(S1): 425-.
|
[15] |
CHEN Dan, LIU Zhe, LIU Jianyou, FANG Qian, HAI Lu.
StateofArt and
Prospects for Intelligent Construction Technology for Railway
Shield Tunneling
[J]. Tunnel Construction, 2021, 41(6): 923-932.
|