| [1] |
WANG Xuejian, ZHANG Yuyu, JIANG Sili, WANG Jiayuan.
Risk Management and Platform Implementation of Shield Tunneling in Metro Engineering Based on Digital Twin
[J]. Tunnel Construction, 2025, 45(11): 2100-2116.
|
| [2] |
ZHANG Chengping, WANG Libin, TANG Haidong, PENG Hua, LI Yujie, NIU Xiaokai.
Study on Causes of Leakage
in Beijing Metro Shield Tunnel and Its Influence
on Segment Structure
[J]. Tunnel Construction, 2024, 44(S1): 456-466.
|
| [3] |
YANG Peng, ZHOU Yong, ZHAO Pinxiang, ZHU Honghai, WANG Hujia, WANG Baofeng.
Optimization of Metro
Shield Tunnel Evacuation Platform Based on Pathfinder
[J]. Tunnel Construction, 2024, 44(7): 1502-1509.
|
| [4] |
ZHANG Mingju, KANG Bo, LI Pengfei, PANG Yuekui, WANG Xijun, WU Hao.
Influence of Cross-Passage Construction Using Front-Traction
Pipe Jacking Method on Mechanical Properties of Metro
Shield Tunnel
[J]. Tunnel Construction, 2024, 44(6): 1165-1173.
|
| [5] |
GUO Yong, GUO Xiaolin, JIAN Yongzhou, ZHANG Jian, FENG Tugen, CHEN Zi′ang.
Identification and Prediction of Composite Ratios for
Strata in Metro Shield Tunnel
Using Artificial Bee ColonyBack Propagation Neural Network
[J]. Tunnel Construction, 2024, 44(3): 484-495.
|
| [6] |
FU Jinyang, ZHANG Hongyu, SUN Qianhui, ZHANG Liangliang, YANG Junsheng, LI Yanan.
Reinforcement Scheme for OpenCut
Highway Tunnel Parallelly-Crossed by Metro Shield Tunnel on North Bank Section of Yellow River-Crossing
Tunnel in Jinan, China
[J]. Tunnel Construction, 2023, 43(S2): 418-427.
|
| [7] |
SHU Zhihua, WANG Dingjun, ZHANG Lei, WANG Xianbao.
Deformation Control of MultiStructure
Underpassing and Overpassing an Existing Metro Shield
Tunnel: A Case Study of Gangxiabei Comprehensive Transportation
Hub Project in Shenzhen, China
[J]. Tunnel Construction, 2023, 43(S2): 504-512.
|
| [8] |
PAN Haize, LI Gen, CHEN Yixi, LUO Zhenhua, HAN Jianqiang.
Critical Factors Influencing Safety Vulnerability of
Metro Shield Tunneling Based
on Structural Equation ModelImportancePerformance
Analysis
[J]. Tunnel Construction, 2023, 43(6): 936-947.
|
| [9] |
HOU Gaopeng, ZHANG Haitao, ZHOU Kun, LENG Biao.
Research on Rapid Drawing Method of Plane and
Longitudinal Section
of Metro Shield Tunnel Based on ObjectARX
[J]. Tunnel Construction, 2021, 41(1): 134-142.
|
| [10] |
Daoyan, XIE Jianbin, LI Zhong, SUN Xiaohai.
Numerical Analysis on Influence of Concealed Karst Caverns
upon Stability of Metro Shield Tunnel
[J]. Tunnel Construction, 2020, 40(S2): 151-160.
|
| [11] |
LIU Yingbin, LIAO Shaoming, CHEN Lisheng, LIU Yiqiang, GU Yingcheng.
Deformation Law of Shield Tunneling underneath an
Adjacent DOT Metro Tunnel in Soft Ground
[J]. Tunnel Construction, 2020, 40(10): 1462-1470.
|
| [12] |
LI Fengyuan, YANG Yandong, XU Huaguo.
Key Technologies for Shield Cutting Plastic Drainage Plate in Consolidated Clay
[J]. Tunnel Construction, 2019, 39(6): 913-918.
|
| [13] |
ZHANG Haitao.
Partial Demolition Scheme for Shield Tunnel Segment in Middle Ventilation Shaft
[J]. Tunnel Construction, 2019, 39(12): 2043-.
|
| [14] |
DENG Zhe.
Precision Detection and Data Processing Method for Portal Steel Ring of Metro Shield Tunnel
[J]. Tunnel Construction, 2019, 39(11): 1832-.
|
| [15] |
YE Yuhang, WANG Jian, XU Wentian, LIU Xin, LIU Xian.
Numerical Analysis of Mechanical Behaviors of Lining of Largediameter Metro Shield Tunnel in Soft Ground
[J]. Tunnel Construction, 2018, 38(S2): 151-160.
|