ISSN 2096-4498
CN 44-1745/U

Tunnel Construction ›› 2021, Vol. 41 ›› Issue (1): 134-142.DOI: 10.3973/j.issn.2096-4498.2021.01.015
Previous Articles Next Articles
Research on Rapid Drawing Method of Plane and Longitudinal Section of Metro Shield Tunnel Based on ObjectARX
HOU Gaopeng1, 2, ZHANG Haitao3, ZHOU Kun3, 4, LENG Biao1, 2 , *
1.School of Civil Engineering,Southwest Jiaotong University,Chengdu 610031,Sichuan,China;2.Key Laboratory of Transportation Tunnel Engineering,Ministry of Education,Southwest Jiaotong University,Chengdu 610031,Sichuan,China;3.China Railway Siyuan Survey and Design Group Co.,Ltd.,Wuhan 430063,Hubei,China;4.NATIONAL LOCAL Joint Engineering Research Center of Underwater Tunnel Technology,Wuhan 430063,Hubei,China
Online:
2021-01-20
Published:
2021-02-08
CLC Number:
HOU Gaopeng, ZHANG Haitao, ZHOU Kun, LENG Biao.
Research on Rapid Drawing Method of Plane and Longitudinal Section of Metro Shield Tunnel Based on ObjectARX [J]. Tunnel Construction, 2021, 41(1): 134-142.
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn.2096-4498.2021.01.015
Viewed | ||||||
Full text |
|
|||||
Abstract |
|
|||||
Support by Beijing Magtech Co.ltd support@magtech.com.cn