[1] |
WANG Jie, CHENG Guolong, ZHOU Bing, HU Wei, TAN Houjun, XIE Jianhong.
Safety Risk Evaluation of
Long-Distance Small-Diameter Tunnel Bored by Tunnel Boring
Machine
[J]. Tunnel Construction, 2024, 44(S2): 211-223.
|
[2] |
JIANG Qiao, WANG Shuangjing, JING Liujie, SHI Yunlong, WEI Xiaolong, LI Pengyu, YANG Chen.
Disc Cutter Wear of Tunnel Boring Machine in Hard Rocks of Pumped Storage Hydropower Station
[J]. Tunnel Construction, 2024, 44(S2): 470-477.
|
[3] |
QUAN Yongwei, WANG Liming, ZHAO Hailei, LI Fengyuan.
Multi-Vehicle Dispatch Management Technology and System Development for Ultra-Long-Distance TBM Tunnels: A Case Study on a Water Supply Project in Northern
Xinjiang
[J]. Tunnel Construction, 2024, 44(S1): 105-112.
|
[4] |
ZHANG Jianming, SHI Kebin, JIA Yunfu, REN Zhiqiang, BAHETEBIEKE Dalayihan, LIU Zhao.
Shapley Additive Explanations Interpretation Model for
Penetration Rate Prediction of Tunnel Boring Machines Based on
Variational
Mode Decomposition and Weighted Random Forest
[J]. Tunnel Construction, 2024, 44(5): 1012-1028.
|
[5] |
QI Mengxue, ZENG Shaoyi, YANG Qinghui, LIU Zhuo, GUO Zhilong.
Comparative Analysis of Material Transport Methods for
Railway Tunnels Constructed With Hard Rock Tunnel Boring Machines
[J]. Tunnel Construction, 2024, 44(5): 1077-1085.
|
[6] |
TAN Zhongsheng, DENG Mingjiang.
Resea-Long
Tunnels
[J]. Tunnel Construction, 2024, 44(3): 442-463.
|
[7] |
LIU Sijin, MA Yuyang, WANG Huawei, WANG Jun, XUE Feng, WEI Yingjie, YU Xingqiao.
Design and Analysis of a Novel Cutter System for a Cutter-Changing
Robot in Tunnel Boring Machines
[J]. Tunnel Construction, 2024, 44(10): 2094-2102.
|
[8] |
SHEN Yanjun, LYU You, LI Shuguang, ZHANG Jinyuan, MA Wen, ZHANG Lei, XU Zhenhao, HUANG Yong.
Research Progress of Tunnel Surrounding Rock
Classification Method and Application Trend of
"Artificial Intelligence+"
[J]. Tunnel Construction, 2023, 43(4): 563-582.
|
[9] |
ZHANG Jianming, SHI Kebin, DALAYIHAN Bahetebieke, SHAN Hongze, SHI Renyi, FU Tao, LU Zhipeng.
Evaluation and Prediction of TBM′s
Geological Adaptability Based on VariableWeight Set PairMultidimensional Linked
Normal Cloud Model
[J]. Tunnel Construction, 2023, 43(4): 645-657.
|
[10] |
NIU Guoliang.
Application of Controlled Drainage Using Pressure
Relief Valves for Single-Shield Tunnel Boring Machine
Segmental Linings
[J]. Tunnel Construction, 2023, 43(12): 2089-2097.
|
[11] |
CHEN Songlin, WANG Lichuan, HU Hengqian, WANG Shuying, YANG Zebin, CHONG Panpan, LU Chuang, CHEN Hongwei.
Fault and Fracture Zone Collapse Treatment Technology
for Open Tunnel Boring Machine
Applied in Beijiang Water Diversion Project
[J]. Tunnel Construction, 2023, 43(12): 2122-2132.
|
[12] |
YANG Yinwei.
Overhaul and Rehabilitation Scheme Along With Cost
Analysis of Open Tunnel Boring Machine in Tunnels: A Case
Study of Qinling Water Diversion Tunnel in Hanjiang
RivertoWeihe River Water
Diversion Project
[J]. Tunnel Construction, 2023, 43(11): 1964-1972.
|
[13] |
JIA Ke, SONG Tiantian, SUN Qianwei, WANG Pinghao, LOU Yonglu, YANG Junwu.
Analysis of Tunneling Performance of Earth Pressure
Balance/Tunnel Boring
Machine DoubleMode Shield in Complex Strat#br#
[J]. Tunnel Construction, 2022, 42(S2): 479-486.
|
[14] |
DU Chuangdong, HONG Kairong, LI Zhijun, YANG Yandong.
Key Technologies of Tunnel Boring Machine Passing
through Unfavorable Geology: a
Case Study of Entrance Section of a Plateau Railway Tunnel
[J]. Tunnel Construction, 2022, 42(7): 1274-1288.
|
[15] |
LI Zhijun, LIU Guangzhi, YU Jingbo, CHEN Qiao.
Key Techniques of Excavation and Blasting in ShallowBuried
Soft and Hard Strata
of Tunnel Boring Machine Preparatory Tunnel of Plateau Railway
[J]. Tunnel Construction, 2022, 42(6): 1044-1052.
|