Tunnel Construction ›› 2022, Vol. 42 ›› Issue (S2): 381-388.DOI: 10.3973/j.issn.2096-4498.2022.S2.047
Previous Articles Next Articles
Construction Method and Excavation Response of ShallowBuried SuperLargeSpan FourTrack HighSpeed Railway Tunnel: a Case
Study of Xiabeishan No. 1 Tunnel on HangzhouTaizhou HighSpeed Railway
YANG Wentao1, LIU Xiabing2, 3, *, HE Shaohui2, ZHANG Xiaohua4, WANG Jianjun4
(1.China Railway Major Bridge Engineering Group Co.,Ltd.,Wuhan 430050,Hubei,China;2.School of Civil Engineering,Beijing Jiaotong University,Beijing 100044,China;3.Guangdong Hualu Transport Technology Co.,Ltd.,Guangzhou 510420,Guangdong,China;4.China Railway Design Corporation,Tianjin 300308,China)