ISSN 2096-4498

   CN 44-1745/U

二维码

Tunnel Construction

Previous Articles     Next Articles

Design and Engineering Practice of C-shaped Connection Channel for Frozen Excavation Method in Rich Water Sand Layer#br#

WANG Qingli   

  1. (China Railway Sixth Survey and Design Institute Group Co., Ltd., Tianjin 300308 )
  • Published:2024-02-04