[1] |
WEI Lixin, OU Zhenfeng, LIU Liying, YANG Chunshan.
Review on Innovative Technology for Immersed Tunnel
Construction in Central Urban Area of Guangzhou
[J]. Tunnel Construction, 2023, 43(S2): 1-9.
|
[2] |
JIN Wenliang, SONG Shenyou, WU Wangjie, LIU Jian, ZHANG Shuangjiao, BAO Rui.
Material Design and Deformation Performance of
Seamless Expansion Joint of Immersed Tunnel
[J]. Tunnel Construction, 2023, 43(S2): 197-207.
|
[3] |
XU Yu, LIU Minghu, XU Guoping, WANG Yong.
Key Technologies of Antireaction of Onland Final Joint
of Hanjiang RiverCrossing Immersed Tunnel in
Yuliangzhou, Xiangyang, China
[J]. Tunnel Construction, 2023, 43(S2): 451-459.
|
[4] |
SHAN Lianjun, GUO Jianmin, NI Pengpeng, LI Jianfeng, MA Huihuan, SUN Wei.
Review on Development of Joint Type and Deformation
Mechanism of
Immersed Tunnel
[J]. Tunnel Construction, 2023, 43(S1): 14-24.
|
[5] |
ZENG Bocun, FENG Jiangdong, ZHOU Xingtao, WANG Cong, SUN Xiaowei, REN Yaopu.
Innovation and Practice of Key Technologies for
Immersed Tunnel
Terminal Joint Based on Friction Antithrust
[J]. Tunnel Construction, 2023, 43(5): 847-855.
|
[6] |
FENG Xiandao, WANG Cong, SUN Xiaowei, ZENG Bocun.
Design and Application of Secondary Cofferdam
Structure at Onshore Final Joint
of Immersed Tunnel: a Case Study of Yuliangzhou Section
[J]. Tunnel Construction, 2023, 43(4): 665-673.
|
[7] |
YE Fei, XIA Tianhan, ZHANG Xingbing, SU Enjie, LIANG Xiaoming, HAN Xingbo.
Present Situation Analysis and Improvement Suggestions on
Nomenclature of Highway Tunnel
[J]. Tunnel Construction, 2022, 42(S2): 1-5.
|
[8] |
XIA Qiaowang, JIN Wenliang, HE Chunning.
Influence of Measuring Tower Offset During
Installation of LongandLarge
Immersed Tunnel Element
[J]. Tunnel Construction, 2022, 42(S2): 220-224.
|
[9] |
ZENG Bocun, CAO Linxiang, ZHOU Xingtao, SUN Xiaowei, WANG Cong, HU Jiayi.
Research and Application of Assembled Steel Bulkhead
for Hanjiang Immersed Tunnel in Xiangyang, China
[J]. Tunnel Construction, 2022, 42(9): 1605-1614.
|
[10] |
GUO Jianmin, SHAN Lianjun.
Structure Type and Prefabrication Scheme of Immersed
Tunnels in Urban Core Areas: a Case Study of Pazhou
West Tunnel Project in Guangzhou, China
[J]. Tunnel Construction, 2022, 42(11): 1906-1912.
|
[11] |
DONG Zhiming, GUO Baode, XU Zeqi, ZHANG Xiaoqin, CAO Jiantao.
Research and Application of Light Environment of
Highway Tunnel Portal Based on BIM Technology
[J]. Tunnel Construction, 2021, 41(S2): 144-150.
|
[12] |
WANG Zhan, ZHANG Baohu, ZHANG Yanmeng, GUO Qiang, SUN Hong.
Damage and Deformation of Chebei Road Immersed Tunnel
Based on Multiple
Lateral Differential Foundation Stiffness
[J]. Tunnel Construction, 2021, 41(S2): 209-214.
|
[13] |
XU Yu, XU Guoping, FU Baiyong, HE Xiao.
Foundation Settlement Control Analysis of Immersed
Tunnel at
Connection between Offshore Artificial Island and Tunnel
[J]. Tunnel Construction, 2021, 41(S1): 338-.
|
[14] |
XU Youjun, LI Degong, SUN Hongbin.
BIMBased Automatic Acquisition and
Intelligent Control Method for Pipeline
Installation Schedule for Auxiliary Works of Subway Station
[J]. Tunnel Construction, 2021, 41(S1): 375-.
|
[15] |
LYU Gang, LIU Jianyou, ZHAO Yong, YUE Ling.
Key Technologies for Intelligent Construction of
Tunnels on Beijing-Zhangjiakou
High-speed Railway
[J]. Tunnel Construction, 2021, 41(8): 1375-.
|