[1] |
CHEN Weigeng, ZHOU Ping, WU Zhonglun, ZHANG Chenyan, GUO Xiaohan.
Disaster Prevention and Evacuation Rescue Management System for Urban Underground Comprehensive Transportation Hub Station
and Peripheral Tunnels
[J]. Tunnel Construction, 2024, 44(S1): 62-70.
|
[2] |
QUAN Yongwei, WANG Liming, ZHAO Hailei, LI Fengyuan.
Multi-Vehicle Dispatch Management Technology and System Development for Ultra-Long-Distance TBM Tunnels: A Case Study on a Water Supply Project in Northern
Xinjiang
[J]. Tunnel Construction, 2024, 44(S1): 105-112.
|
[3] |
WANG Wei, YANG Guang, REN Taozhe, DU Kenan, LYU Fengying, WANG Junjie.
Stress Characteristics and Parameter Optimization of Anchor Bolt Support in Small-Section
TBM Tunnels
[J]. Tunnel Construction, 2024, 44(S1): 237-246.
|
[4] |
XIE Yipeng, LIANG Xiong, YANG Junsheng, PENG Xuejun, LIU De′an.
Stability of Large-Section Excavated Tunnel Face in Badong Fomation Mudstone Considering Water-Rock Softening
Effect
[J]. Tunnel Construction, 2024, 44(S1): 274-285.
|
[5] |
HE Yonghong.
Deformation Control
Technology of a Shield Tunnel of Chengdu Metro
Line 9 Crossing Underneath a High-Speed Railway Tunnel
[J]. Tunnel Construction, 2024, 44(S1): 396-407.
|
[6] |
ZHANG Xinyi, WANG Mingbo, LI Jiaheng, CHENG Yonglong, PENG Zhanjie.
Optimization of Main Drive Sealing Structure of Tunnel Boring Machine Based on Orthogonal Test
[J]. Tunnel Construction, 2024, 44(S1): 437-447.
|
[7] |
ZHENG Zefu, MA Weibin, GUO Xiaoxiong, TIAN Siming, XU Tianyuan, WANG Wei.
Freezing Patterns of
Railway Tunnel Drainage Systems in Cold Regions
[J]. Tunnel Construction, 2024, 44(9): 1792-1798.
|
[8] |
JIA Lianhui, SUN Heng, ZHANG Xingbin, YU Qingzeng, LI Lei, NING Xiangke.
Crucial Construction
Technology of Tunnel Boring Machines for Constructing Large-Slope Inclined Shaft in Pumped Storage
Power Station
[J]. Tunnel Construction, 2024, 44(8): 1660-1668.
|
[9] |
ZHAO Peng, MA Weibin.
Key Technologies and Implementation Method of Intelligent Operation and Maintenance of Railway Tunnels Based on Digital Twins
[J]. Tunnel Construction, 2024, 44(8): 1697-1712.
|
[10] |
XIAN Guo, ZOU Yongmu, LI Xiaobing, WANG Guan, WANG Yangyang.
Integrated Application and
Some Issues of Modern Tunneling Technology
for Chengdu-Kunming Railway Tunnel
[J]. Tunnel Construction, 2024, 44(8): 1713-1722.
|
[11] |
WANG Yingxue, LIU Hengyuan, JIN Xianghai, SUN Haocheng, ZHANG Weihua, FANG Yufei, MA Weibin.
Comprehensive Impact Analysis of Micropressure Wave Mitigation at Entrance and Exit of a 400 km/h High-Speed Railway Tunnel
[J]. Tunnel Construction, 2024, 44(7): 1422-1430.
|
[12] |
MA Weibin, WEN Guochun, ZHU Huazhong, HAN Jiaqiang, WANG Chen, TIAN Jingwei, CHENG Aijun.
Sonic Boom and Alleviated
Measurements in Wan′an Tunnel
of Beijing-Hong Kong High-Speed Railway
[J]. Tunnel Construction, 2024, 44(7): 1431-1439.
|
[13] |
LIANG Zhenglong, YANG Yang, WEI Kang, DU Yunchao, MEI Yuangui.
Characteristics and Distribution Pattern of Surface Aerodynamic Load on Lining of 400 km/h High-Speed Railway Tunnels
[J]. Tunnel Construction, 2024, 44(7): 1465-1476.
|
[14] |
ZHOU Zhenliang, LEI Ke, LI Qinglou, XIAO Haihui, SU Shan.
Correlation Between Surrounding Rock Conditions and
RockSlag Grading of Tunnels Bored Using Tunnel
Boring Machines Via Image Recognition
[J]. Tunnel Construction, 2024, 44(5): 964-972.
|
[15] |
LI Zonglin, LI Qinglou, ZHANG Lilong, GUO Yang.
Correlation Analysis Between Surrounding Rock
Parameters and Mainframe Vibration of an Open Tunnel Boring
Machine
[J]. Tunnel Construction, 2024, 44(5): 991-999.
|