| [1] |
YANG Jian, WU Jiaming, DAI Linfabao, TIAN Li, LIU Xiuguo, SUN Jie, SUN Wenhao.
Deep-Learning-Based Intelligent Design Method and Application of Lining for High-Speed Railway Tunnels Using Mining Method
[J]. Tunnel Construction, 2025, 45(9): 1742-1755.
|
| [2] |
SONG Chaoye, LIU Wenjun, HE Weiguo, YU Yong, LYU Shuqing.
Key Technologies for Design of Pearl River Estuary Subsea Tunnel of Shenzhen-Jiangmen Railway
[J]. Tunnel Construction, 2025, 45(8): 1561-1576.
|
| [3] |
GUO Xiansuo.
Construction Technology of Prefabricated Inverted Arch in Single-Track
Railway Tunnels by Mining Method
[J]. Tunnel Construction, 2025, 45(3): 623-635.
|
| [4] |
QI Chun, YU Yu, PANG Tao, LIU Jinsong, TIAN Siming, WANG Chuang, LUO Lusen.
General Design Scheme For
Shu′an Tunnel of Chengdu-Chongqing Midline Railway
[J]. Tunnel Construction, 2024, 44(S2): 391-398.
|
| [5] |
QIN Yinping, LI Zhanguo, LIU Yongsheng, GU Tianxin, WAN Xueyu, ZHANG Bin.
Key Technologies and Development Trend of Intelligent Large-Diameter-Shield Tunnel
Construction in China
[J]. Tunnel Construction, 2024, 44(S1): 25-35.
|
| [6] |
DU Chuangdong, DU Yihang, HUANG Xiaofu.
Control Technology for
Segment Dislocation and Attitude
of Large-Diameter Shield Tunnels
[J]. Tunnel Construction, 2024, 44(7): 1510-1519.
|
| [7] |
WANG Defu.
Anti-Fatigue Design of Field Welds of Shield Cutterheads Based on Structural Stress Method
[J]. Tunnel Construction, 2024, 44(6): 1313-1319.
|
| [8] |
CHEN Yangxun, XIAO Mingqing, XUE Guangqiao, ZHANG Di.
Vibration Response
Characteristics of Prefabricated Middle Partition
Walls in Large-Diameter Shield Tunnels
[J]. Tunnel Construction, 2024, 44(12): 2376-2384.
|
| [9] |
ZENG Yi, WU Jiamin, BIAN Yuewei, TANG Jiayou, YAN Tao, SHEN Shuilong.
Tunneling Attitude
Prediction for Large-Diameter
Slurry Balance Shields Using Long Short-Term Memory
[J]. Tunnel Construction, 2024, 44(11): 2139-2148.
|
| [10] |
LIN Chungang, MA Zhaolin, CHEN Yongliang, LI Jing, SHANG Wei HAN Weifeng.
Assembly Technology of Prefabricated Arc Parts and
Application of Intelligent Assembling Machine for Large-Diameter
Shield Tunnels
[J]. Tunnel Construction, 2023, 43(3): 460-477.
|
| [11] |
WANG Song, XIE Yunlai, QING Weichen, YANG Changyu, WANG Jianhong, YANG Yi.
Design of Prefabricated Lining Structure at Tunnel
Arch Constructed with Mining Method
[J]. Tunnel Construction, 2022, 42(S1): 360-368.
|
| [12] |
CHU Kai, HE Weiguo, YU Yong.
Route Scheme of Pearl River Estuary Tunnel Project of ShenzhenJiangmen Railway
[J]. Tunnel Construction, 2022, 42(9): 1597-1604.
|
| [13] |
YANG Zhao, XIONG Dongdong, XU Chao, CHEN Shaolin, HE Chuangbo.
Automatic Selection Algorithm for Shield Tunnel
Segment Rings Based on Intelligent Acquisition of
Parameters
[J]. Tunnel Construction, 2022, 42(5): 817-825.
|
| [14] |
DAI Xin, HE Weiguo, WANG Dongwei, LYU Qingsong, YU Yong.
Drainage Design of a DeepBuried
Subsea Tunnel Using Mining Method: a Case Study of Pearl River Estuary Railway Tunnel
[J]. Tunnel Construction, 2022, 42(4): 695-702.
|
| [15] |
SUN Feixiang, PENG Zhengyong, ZHOU Jianjun, YANG Zhenxing, ZHANG Jichao, TANG Zongxiong.
Study on Breakthrough Modes in Docking Section between
Shield and Mined Sections Considering Rock Mass Classification
[J]. Tunnel Construction, 2021, 41(8): 1336-.
|