ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2009, Vol. 29 ›› Issue (3): 305-309.DOI: B
• wenzhang • Previous Articles Next Articles
ZHANG Bin
Received:
Revised:
Online:
Published:
Abstract:
Abstract: Taking the shield launching and arriving at Yuanshen Road intermediate ventilation shaft in No.2 bid section of second phase of No.9 Line of Shanghai Metro as an example, the author presents the technological problems including extradeep cover, confined water, freezing method, curve with small radius, shield parallel moving along curve path in ventilation shaft and shield tunnelling near buildings. After scheme optimization, practical countermeasures including strengthening waterproofing at tunnel portal, adoption of launching along tangent and arriving with compensation and advance reinforcement of nearby building was put forward, which ensures the successful launching and arriving of the shield.
Key words: shield, complex geologylaunching and arrivingextradeep coverconfined watercurve with small radiusfreezing methodgreasy polyurethane
CLC Number:
 
U 455.43
ZHANG Bin. Construction Technology of Launching and Arriving for Shield Tunnelling in Complex Geology[J]. Tunnel Construction, 2009, 29(3): 305-309.
/ Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/B
http://www.suidaojs.com/EN/Y2009/V29/I3/305
Analysis and Optimal Control of Shield Tunnel Construction Parameters Using Categorical Boosting-Nondominated Sorting Genetic Algorithm-Ⅲ
Innovation and Application of Control Survey Method in Wangjing Tunnel of BeijingShenyang PassengerDedicated Line
Failure Mechanism of Shield Tunnel Based on Full-Scale Experiment and Analysis of Longitudinal Joint′s Outboard Deformation
Research and Application of Fluid Technology of EPB Shield Muck Environmental Protection Treatment
Evaluation Standards for Water Tightness of Shield Tail Sealing Grease under Conditions of High Water Pressure