Analysis on Parameters of Pipe Roof Advance Support Installed in Portal
Sections of Shallowburied Doublearched Tunnels
BI Junli1, WANG Weifeng2,LIU Changlin3
1. China Railway Tunnel Survey &|Design Institute Co. Ltd.2. Beijing Urban Engineering Design &|Research Institute Co., Ltd3. Development and Management Department of Air Defense Works of Luoyang
BI Junli, WANG Weifeng,LIU Changlin. Analysis on Parameters of Pipe Roof Advance Support Installed in Portal
Sections of Shallowburied Doublearched Tunnels[J]. Tunnel Construction, 2008, 28(4): 438-444,455.