Tunnel Construction ›› 2008, Vol. 28 ›› Issue (4): 434-437,451.DOI: A
• wenzhang • Previous Articles Next Articles
LIU Hao, XIAO Wuquan, LENG Wuming
Received:
Revised:
Online:
Published:
Abstract:
Due to the influence of the highrise building under construction, the existing power cable tunnel that passes underneath the highrise building is subject to complex loading conditions. In order to avoid serious deformation of the power cable tunnel, monitoring measurement plan is worked out. Convergence monitoring and lining surface stress monitoring are made for the tunnel and the monitoring results are analyzed. The monitoring result shows that although the construction of the highrise building above the tunnel has some influence on the tunnel, the deformation of the surrounding ground of the tunnel is small, the convergence slow down when the highrise building is topped out and the crown settlement of the tunnel is larger than the horizontal convergence. Therefore conclusion is drawn that the tunnel is stable.
CLC Number:
 
U451
LIU Hao, XIAO Wuquan, LENG Wuming. Monitoring and Analysis on Influence of Highrise Building Construction on Existing Underneath Tunnel[J]. Tunnel Construction, 2008, 28(4): 434-437,451.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/A
http://www.suidaojs.com/EN/Y2008/V28/I4/434