Doubleshield TBMs have been successfully applied in many works both in China and foreign countries. However, some problems have occurred in some works, which causes that the construction of the works can not be executed according to the plan. In the paper, the application of doubleshield TBMs in China is presented, the problems occurring during construction are analyzed and it is proposed, on basis of engineering practice, that equipment purchasing, project planning, construction organization management and construction technology management should be taken as the control points of longdistance tunnel construction by means of doubleshield TBMs and corresponding works cases are provided. Expatiation is made on how to do a good job for the details in the longdistance tunnel construction by means of doubleshield TBMs. Personal opinions are made on the development trend of doubleshield TBMs and countermeasures are suggested for the problems occurring during the longdistance tunnel construction by means of doubleshield TBMs.
CLC Number:
 
U455.43
MENG Xianjun. Comments on Longdistance Tunnel Construction by means of Doubleshield TBMs[J]. Tunnel Construction, 2008, 28(4): 429-433,475.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/B
http://www.suidaojs.com/EN/Y2008/V28/I4/429