[1] |
XIAO Mingqing, YU Xiongbing, XUE Guangqiao, ZHANG Chaoyong.
Waterproofing Mechanism of Double Seal Gaskets
Considering Breakdown Water Pressure
[J]. Tunnel Construction, 2022, 42(5): 791-797.
|
[2] |
WANG Kai, ZENG Chuigang, LI Zhiguo.
Load Calculation and Analysis of SuperLargeDiameter Slurry Shield Tunneling in SoilRock Interbedded Strata
[J]. Tunnel Construction, 2022, 42(5): 873-881.
|
[3] |
YUAN Peng, WEI Lifeng, HE Xiaobin.
Deformation Control of Pile Foundation Laterally
Crossed by a SuperLargeDiameter
Shield near Yellow River Embankment: a Case Study of
Yellow Rivercrossing Tunnel on Jiluo Road in Jinan,
China
[J]. Tunnel Construction, 2022, 42(5): 907-916.
|
[4] |
WANG Shimin, PENG Xiaoyu, CHEN Bing, WANG Xianming, RUAN Lei.
Surrounding Rock Stress Release Rate of Shield Tunnel
in UpperSoft and LowerHard Strata
[J]. Tunnel Construction, 2022, 42(4): 594-601.
|
[5] |
YANG Xiuren.
Research and Application of Prefabricated Structure Construction
Technology for Metro Station
[J]. Tunnel Construction, 2022, 42(3): 345-354.
|
[6] |
TAO Lianjin, CAO Qiankun, SHI Cheng, DING Peng.
Seismic Responses of Prefabricated Metro Stations
Built at Different Sites
[J]. Tunnel Construction, 2022, 42(3): 378-387.
|
[7] |
PENG Zhiyong, YANG Xiuren, HUANG Meiqun, LIN Fang, YANG Ming.
Mechanical Behavior of Prefabricated Underground Station
Structure in Construction Stage
[J]. Tunnel Construction, 2022, 42(3): 398-405.
|
[8] |
LIN Fang.
Mechanical Property Analysis of Top Arch Joint for
Prefabricated Underground Metro Station Structure Based on Insuit
Monitoring
[J]. Tunnel Construction, 2022, 42(3): 430-436.
|
[9] |
LIN Fang, PENG Zhiyong.
Influence of Different Structure Types of
Prefabricated Metro Station on Mechanical Properties of Grouted
MortiseTenon Joint〖
[J]. Tunnel Construction, 2022, 42(3): 420-429.
|
[10] |
GUO Haiyang, LIU Changyong, LI Bingde, BAO Xianfeng, WANG Yantao.
Processing Quality Inspection and Installation
Accuracy Prediction of Prefabricated
Metro Components
[J]. Tunnel Construction, 2022, 42(3): 437-444.
|
[11] |
ZHANG Guowei, LI Dewu, LEI Xiaotian.
Folding Steel Arch Frame Applicable to Mechanized Construction
of Tunnels and Its Key Techniques
[J]. Tunnel Construction, 2022, 42(3): 445-450.
|
[12] |
HUANG Meiqun.
Key Technology for Design of ClosedCavity
ThinWalled Precast Components
of Underground Structures
[J]. Tunnel Construction, 2022, 42(3): 471-477.
|
[13] |
TAO Lianjin, HUANG Linkun, SHI Cheng, ZHANG Naijia.
Deformation Control Standards for Super-Large-Span Flat Underground Cavern
[J]. Tunnel Construction, 2022, 42(1): 9-15.
|
[14] |
WANG Mingnian, LIU Kerui, ZHANG Yiteng, YANG Henghong, YU Li.
Research on Flexural Capacity of Steel Reinforced
Concrete Beams Subjected to Steel Arch Corrosion
[J]. Tunnel Construction, 2022, 42(1): 26-32.
|
[15] |
ZHOU Jinzhong, FAN Taixing, DU Jinhai.
Design Technology of Outdoor Fire Hydrant Systems in
Underground Metro Stations
[J]. Tunnel Construction, 2022, 42(1): 121-129.
|