Tunnel Construction ›› 2009, Vol. 29 ›› Issue (5): 582-586.DOI: B
• wenzhang • Previous Articles Next Articles
LOU Zhang-Yin
Received:
Revised:
Online:
Published:
Abstract:
Taking the application of the 3boom rock drilling jumbos in the advance pregrouting hole drilling during the construction of Xiang'an subsea tunnel in Xiamen as an example, the author presents the application technologies and application scopes of multiboom rock drilling jumbos in advance pregrouting hole drilling in fullyheavily weathered ground during construction of mined tunnels, by making comparison and contrast between multiboom rock drilling jumbos and other drilling machines. This paper can provide reference for similar projects in the future.
Key words: multiboom rock drilling jumbo, mining method, advance pregrouting, fullyheavily weathered ground
CLC Number:
U 455.3+2
LOU Zhang-Yin. Application of Multiboom Rock Drilling jumbos in Advance Pre grouting Hole Drilling during Construction of Mined Tunnels[J]. Tunnel Construction, 2009, 29(5): 582-586.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/B
http://www.suidaojs.com/EN/Y2009/V29/I5/582
Drainage Design of a DeepBuried Subsea Tunnel Using Mining Method: a Case Study of Pearl River Estuary Railway Tunnel
Development and Research Direction of Utility Tunnels Constructed by Mining Method
Study on Prefabricated Lining Structure Design of a Metro Tunnel Constructed by Mining Method