ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2005, Vol. 25 ›› Issue (5): 28-30,34.
• wenzhang • Previous Articles Next Articles
JIANG Qiang-Bin
Received:
Online:
Published:
Abstract:
Through surveying of and gauge analysis on 7381 existing tunnel, the gauges of the trains and the technical parameters of the alignment of phase Ⅰ of the rail transit systems of Harbin city is preliminary determined, which can provide reference for costsaving and more efficiency achieving in the construction of the Metro systems and for the feasibility study and design of the Metro systems.
Key words: tunnel , survey , gauge , analysis preliminary , study
JIANG Qiang-Bin. nalysis |and |Study on |Gauge |Survey of An Existing |Tunnel[J]. Tunnel Construction, 2005, 25(5): 28-30,34.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/
http://www.suidaojs.com/EN/Y2005/V25/I5/28